Line 16: Line 16:
Swarming on Backhoe and Ironworker build today. Ironworker: pivot plates, blade mount, cylinder mount, cut shaft, and done. Backhoe: bucket attach, boom and stick drilling, cutting of rest of materials, building pivot, cutting shaft, attaching cylinders, adding QA mount, making pins. On Bulldozer Geardown - need to drill out keyways. Need mills. Sweiger: belt. refining [[Design Sprint#Design_Process]]
Swarming on Backhoe and Ironworker build today. Ironworker: pivot plates, blade mount, cylinder mount, cut shaft, and done. Backhoe: bucket attach, boom and stick drilling, cutting of rest of materials, building pivot, cutting shaft, attaching cylinders, adding QA mount, making pins. On Bulldozer Geardown - need to drill out keyways. Need mills. Sweiger: belt. refining [[Design Sprint#Design_Process]]


=Sun Jun 28, 2013=
Rest day. Parts arriving late delays 6 in 60. Will build Microtrac, Ironworker, Backhoe in time. Bulldozer or Truck will be done Wednesday, but not both. Started [[21 Agriculture and Construction Tools]]. [[Network Project Diagram]].


=Sat Jun 27, 2013=
Continuing on build sprint, finishing the [[Bulldozer Geardown Module]] with [[Kavitha]]. Requested [[James Log]] to continue the [[50 hp Power Cube]]. Updated [[Design Sprints]] to a proposed weekly participant number of 584 individuals every Saturday.
=Fri Jun 26, 2013=
[[Mike Hill Modular Wheel Units Order]] aborted after 30 of 200 parts due to plasma cutter issue - [[Cutmaster 52]] is burning a tip every 10 parts even though air dryer is in place. We need an air dryer as our plasma cutter exploded after water trap filled up and spilled inside machine.  Rest of Mike Hill order - we will be cutting by hand and reducing 6-way to 4-way blade on the bulldozer unless I can pull some magic. [[Cloverdale Manufacturing 6 in 60 Metal Order]] expected today - will be finished Tuesday because it is taking them longer than expected to do 4-sided tubing. Got all flats and 16 10 foot tubes, 1/4", so far.
=Thu Jun 25, 2013=
Formalizing [[Design Sprint]] method. Last week of 6 in 60.
=Wed Jun 25, 2013=
Delivering spare [[Cutmaster 52]] to [[Mike Hill]] so he could finish cutting. Cutting parts in shop - wheels.
=Tue Jun 25, 2013=
'''Weekly Plan and Review. Promising to build 5 machines AND organize the First Focused Concept Design Sprint on [[CNC Construction Set]] - to nail out SEBD (comprehensive) and Interface Design and beging Specific Dev Pathway a la [[Concept Design Workflow]]. Last week: Achieved all design and part sourcing, missed Scoping out of CNC Torch Table simply because sourcing and design was all encompassing.''' Updated [[Sourcing]] to XXH Pipe. Got tubing from Metal By The Foot. Mike is having trouble with his [[Cutmaster 52]] overheats and burns a tip per part.
=Mon Jun 24, 2013=
[[Pipe Schedules]]. Fab procedures and buildout begins. [[Desktop Circuit Production]]. [[Bolt Head Sizes]].
=Sun Jun 23, 2013=
Finalizing [[Mike Hill steel order. [[True Fans 2013]]. Stayed up all night finalizing [[Mike_Hill_Modular_Wheel_Units_Order]]
=Sat Jun 22, 2013=
Design Sprint. [[2013 Milestones]]. [[Lost PLA Casting]]. [[Hydraulic Motor Calculations]]. [[Overhung Load Adapters]]. From Gene Griffith of [[Gene Log]] - [[Permco Hydraulic Motors]] for hydraulic gear motors and pumps. Axial Piston Pump can be 95% volumetric efficiency. Gear Pumps - 85%. [[Hydraulic Gear Pump]] or [[Hydraulic Gear Motor]].
=Fri Jun 21, 2013=
Spent 2 hours with Gary on getting him ready take over the entire mechanical GVCS section so I can transition to precision machining/metallurgy and automation. Most of day spent sourcing outstanding parts, couple meetings with Crew, and then Design Sprint Prep at 7 PM. Interns taking a day of rest to prep for the 10 Day Build Sprint that starts Monday. Requested Katie to assess a Work Log for [[Work Log Standards]] - according to new checklist.
=Thu Jun 20, 2013=
Linked to [[Sprints and Hackathons]]. '''[[6 in 60 Sprint]] planning and prep'''. Finalizing [[6 in 60 Part Ordering]]. Continuously reworking [[3 Inch Wheel Hub]]. Made changes to [[Mike Hill Modular Wheel Units Order]]. Ordered spare bandsaw blades, springs, annular cutters, began work on Torch Table and found more mechanical parts missing. 6 in 60 Quality Control Session Prep with Gary, 2 hours. Started [[Quality Control Protocol]]. Called [[John Motloch]] re Master Plan.
=Wed Jun 19, 2013=
[[Workshop Maintenance Process]] request. Finalizing [[6 in 60 Part Ordering]] and [[Kliment Scope of Work - CNC Torch Table Height Control]]. Conceptualizing '''[[Conceptual Design Sprint Protocol]]'''. Lucas's [[Triangle Calculator]]. Began discussing OSE performance [[Image:check.png|15px]]'''[[Metrics]]''' with Katie. Updated [[Ironworker - How It Works]]. Posted [[Ironworker Parts]]. Began [[Methane Digester Conceptual Design]].
=Tue Jun 18, 2013=
Referred to [[OpenStructures]] review by Karien. Reconciling [[Lucas Log]] with [[Justin Burnett Log]] for DXF files for wheel units. [[Blog Update Compiling]] document from Katie. [[Protocol Protocol]]. [[Open IP Assignment]] document. Generating DXFs for CNC cutting for Modular Wheel units from [[Lucas Log]] and [[Justin Burnett Log]]. Guiding [[Kliment Log]] to post [[CNC Torch Table in Linux]] information based on [[CoolRAMPS]], and building on [[[[DXF_to_G-code_Conversion_Tutorial]] to integrate RepRap toolchain into the puzzle. [[Ultrasound Torch Height Controller]] from Kliment based on a $32 part. [[Exporting Sketchup Files for Cutting on a CNC Torch Table]].
=Mon Jun 17, 2013=
[[Parking Lot]] from Audrey. Rob setting up [[Dozuki]]. Showed [[Prototyping Plan 2013]] to Katie. Met with [[Andrew and Catharina]] on Contributor Agreements and Legal, updated [[OSE License]]. '''Week Goals: Finish outstanding design: [[Image:check.png|15px]] bulldozer geardown (4x). [[Image:check.png|15px]] Steel Wheels.  Backhoe Legs/Bucket/Feet. Control Cab. Microtrac wheel hub. Articulated LifeTrac. Scope out work for CNC Torch Table. Order Hydraulics, bolts, and [[Image:check.png|15px]]second CNC Torch Table cutting order. Review of Week: Intended to go towards completion of CNC Torch Table, Got in 1/10 the time on the torch table because of priority on finishing 6 in 60 Designs. Hold Katie to proper Work Log management.'''
=Sun Jun 16, 2013=
Returning to [[CEB Press Controller Wiring Diagram]] by [[Dorkmo]]. [[Gear Pump Calculator]] from [[Gene Log]] - nice MIT link to gear pumps. Updated [[CoolRAMPS]]. Data on 4 bolt [[3" Bearings]].
=Sat Jun 15, 2013=
Majorly successful design sprint - see [[Dashboard]]. Had 17 contributors, well on our way to 50 regular ones and peak 250 for One Day Design Sprints. Major contribution was [[Yann Log]] on [[Velocar]], [[Tim Log]] on [[HydraFabber]] laser diode, and [[Gene Log]] on hydraulic gear motor design. Other than this, all our interns began doing hydraulic diagrams according to [[Hydraulic Diagram Standards]]. Updated [[OSE Workflow Infographic]]. Added [[Glimpses Prezi]] to Glimpses page. Audrey added a quick reference sheet on [[Technical Team Contributors]]
=Fri Jun 14, 2013=
Looking into Google Fiber Beamed to FeF with the [[Free Network Foundation]]. Updated [[Video Backlog]]. Started '''[[OSE Workflow Infographic]]'''. Updating [[Rapid Prototyping Crash Training]] for hydraulics. Beginning [[CoolRAMPS]] for OSE CNC Torch Table. Considering [[Thermal Dynamics Cutmaster 52]] plasma cutter. Talked to [[Katie]]. Audrey produced a [[Developer Profile Template]].
=Thu Jun 13, 2013=
From [[FellowUp]] - see video of [[Dan Whaley - The Revolution Will be Annotated 2013]]. Updated [[Champions of Change]]. Starting wiring up CNC Torch Table controller for [[Cool DRV]] open source stepper motor controller by [[Kliment]], as part of [[Long Term Open Source Stepper Controller Development]]. Formalizing [[Developer Vetting Process]]. Talked to Matt Scully of [[Alohabet Energy]] about potential application of his silicon-based thermoelectric (TEG) innovation in the OSE Solar Concentrator Electric System. May provide sample TEG modules - interested in building open source applications of his propriatary semiconductors. Cost of semiconductor fab is a couple million, we can probably do it for $5 using CEB-block [[Class 1 Cleanroom]]. Sending in update and budget requests to Shuttleworth. Discussing [[Open Source Wireless Mesh Extenders]] with [[Paul Gardner-Stephen]].
=Wed Jun 12, 2013=
Started [[Active Technical Contributors]] spreadsheet on wiki. [[Retreat Preparation]]. [[Email Responses]]. [[Point Recruiting Wishlist]]. Started [[Performance Metrics]] spreadsheet. Standard [[RFQ]] - request for quote. Revisiting [[Prototyping Plan 2013]]. Revisited [[OSE Status Brief]]. Beginning [[OSE Chapters Development]] based on [[OKFN]] work.
=Tue Jun 11, 2013=
Had 2 hour session with students on basic design principles of [[6 in 60 Campaign]]. Added [[OS Stepper Drivers]] redirect. Conceptual Detail of [[Pivot Module Review]]. [[Branding]]. Talked to [[Danny Aranda]]. Began formulating [[One Day Design Challenge]]. [[DIY Laser Diode Projects]]. Started [[Wikispeed Frame Review]]. Rob talked to [[Wayne Tollefson]] - will build our Power Cube - and get next door neighbor on TIG Welding. [[Wikispeed Crash Testing Results]]. [[Dune Buggy]]. Beginning on [[OSE XL2]]. Beginning [[Modular Car Wheel Unit]]. Beginning to define [[Technical Advisory Board]].
=Mon Jun 10, 2013=
Getting back into flow of things from [[Glimpses]]. Weekly plan and review: Last week was in Washington DC for [[Champions of Change]] and at [[Glimpses]]
=Sat Jun 8, 2013=
Awesome [[Glimpses]] conference. Talk was received very well. Found [[OSE Microhouse]] designer, and got access to [[Quid]].
=Fri Jun 7, 2013=
Interesting time with [[Andy Walshe]] and Glimpses Human Potential event - discussed Open Sourcing Peak Performance. [[Sketchup Export to Blender]]. Began [[Video Script Backlog]]. [[OSE Status Brief]]. Announcing [[OSE Production Manager]]. Developing [[Rapid Prototyping Crash Training]]. [[Klout]] from Jordan.
=Thu Jun 6, 2013=
Got [[Steel Quote from Cloverdale Manufacturing]] at under a dollar a pound. Need to reduce diameter of [[Stock Pivot Plate]] to 4.75 - as the space around DOM needs be only 1/8" for weld-in. Need to change the Sketchup and DXF. I changed the DXF manually. [[Tech Team Resumes]]. Signed up for [[Box.com]]. Rob and Emily producing [[Glimpses Prezi]].
=Wed Jun 5, 2013=
Missed 2 flights, got back today. Caught up with Gary on prototyping. Linking up [[Status Briefs]] for all modules - concept is to do a quick video script - perhaps with tablet - then upgrade with [[Popcorn]] links for prior wiki work + animations + other video - starting with 2 column script where text is on one side and Popcorn mouseover links and other media are in another column. Requesting [[Video Production Team]] and [[Video Instructionals Backlog]] from Rob. Talked to [[Simon Kirk]] of [[Raisedby.us]]. Simon introduced me to [[Jessica Lawrence]].
=Tue Jun 4, 2014=
Going to the White House, one day trip as [[Champions of Change for Crowdfunding]]. [[White House Champions of Change Press Release]].
=Mon Jun 3, 2013=
First official day for 4 interns. Day of meetings and onboarding. Husam decided to leave early. Graded driveway with LifeTrac for access by plumber - need to unclog sewer pipe, install propane lines, and install larger on-demand heater. Blogged [[Glimpses]] event.
=Sun Jun 2, 2013=
Planning out next 2 weeks by reprioritizing [[6 in 60]] Modules for 2 week design sprint with 6 interns, all of whom know CAD or have some experience with Sketchup. [[Sarrus Linkage Linear Bearing]] from William Langford of [[MTM]]. Rob published first version of [[Work Log Instructional]] video.
=Sat Jun 1, 2013=
Published [[OSE BOM Standards]]. Had 4th Design Sprint. Concerned about constant [[Contributor Numbers]] for Design Sprints. Intended contributor growth is 6 per week until we reach 50, followed by paralleling via other OSE Chapters.


=Older Entries=
=Older Entries=

Revision as of 21:44, 3 July 2013

see Work Log for howto.

Wed Jul 3, 2013

Redesigned final integration details on backhoe, and assembling pivot to stabilizer legs, boom, stick and tractor mount. Next Culture Research and Training Center. Open Source Appropriate Technologies Paper. Open Source Alternative to Matlab. Planning our first scheduled Design Sprint - Design Sprint - Jul 6, 2013. LifeTrac Development Matrix.

Tue Jul 2, 2013

Struggling with integration detail on Backhoe. Lack of scale prototype and step-by-step procedure means we are figuring things out on the fly for details of fit - thereby extending build time by a day. Main pivot was assembled. Requires careful step-by-step in order to do it on the first try.

Mon July 1, 2013

Swarming on Backhoe and Ironworker build today. Ironworker: pivot plates, blade mount, cylinder mount, cut shaft, and done. Backhoe: bucket attach, boom and stick drilling, cutting of rest of materials, building pivot, cutting shaft, attaching cylinders, adding QA mount, making pins. On Bulldozer Geardown - need to drill out keyways. Need mills. Sweiger: belt. refining Design Sprint#Design_Process