=Thu Jul 4, 2013= | =Thu Jul 4, 2013= | ||
Rest day from [[6 in 60 Documentation]]. Scheming to the relevance of 3D printing as a critical, not luxury, aspect of machine prototyping. [[Straw Board]] | Rest day from [[6 in 60 Documentation]]. Scheming to the relevance of 3D printing as a critical, not luxury, aspect of machine prototyping. [[Straw Board]] reference from Scott Truax and [[John Motloch]]. | ||
=Wed Jul 3, 2013= | =Wed Jul 3, 2013= |
Revision as of 20:56, 4 July 2013
see Work Log for howto.
Thu Jul 4, 2013
Rest day from 6 in 60 Documentation. Scheming to the relevance of 3D printing as a critical, not luxury, aspect of machine prototyping. Straw Board reference from Scott Truax and John Motloch.
Wed Jul 3, 2013
Redesigned final integration details on backhoe, and assembling pivot to stabilizer legs, boom, stick and tractor mount. Next Culture Research and Training Center. Open Source Appropriate Technologies Paper. Open Source Alternative to Matlab. Planning our first scheduled Design Sprint - Design Sprint - Jul 6, 2013. LifeTrac Development Matrix.
Tue Jul 2, 2013
Struggling with integration detail on Backhoe. Lack of scale prototype and step-by-step procedure means we are figuring things out on the fly for details of fit - thereby extending build time by a day. Main pivot was assembled. Requires careful step-by-step in order to do it on the first try.
Mon July 1, 2013
Swarming on Backhoe and Ironworker build today. Ironworker: pivot plates, blade mount, cylinder mount, cut shaft, and done. Backhoe: bucket attach, boom and stick drilling, cutting of rest of materials, building pivot, cutting shaft, attaching cylinders, adding QA mount, making pins. On Bulldozer Geardown - need to drill out keyways. Need mills. Sweiger: belt. refining Design Sprint#Design_Process
Older Entries
- Marcin Log - June 2013 - Sprinting
- Marcin Log - May 2013 - Rough Taste of Freedom
- Marcin Log - April 2013 - OSE 2.0 Beginning
- Marcin Log - March 2013 - End of Slumber
- Marcin Log - February 2013 - Operations Manager Recruiting
- Marcin Log - January 2013 - The Next Phase
- Marcin Log - December 2012 - Time for the Christmas Gift to the World
- Marcin Log - November 2012 - Stabilizing
- Marcin Log - October 2012 - Heating Up for Winter
- Marcin Log - September 2012 - Collaboratorium. Back to logging Sep. 13, 2012
- Marcin Log - August 2012 - chaos
- Marcin Log - July 2012 - exile
- Marcin Log - June 2012 - heat
- Marcin Log - May 2012
- Marcin Log - April 2012
- Marcin Log - March 2012
- Marcin Log - February 2012
- Marcin Log - January 2012
- Marcin Log - 2011