= Thu Aug 1, 2013 = | |||
[[Open Source License Compliance Audit]] for software in manufacturing. | [[Open Source License Compliance Audit]] for software in manufacturing. | ||
=Wed Jul 31, 2013= | = Wed Jul 31, 2013 = | ||
Started [[Development Templates]]. | Started [[Development Templates]]. | ||
=Mon Jul 29, 2013= | = Mon Jul 29, 2013 = | ||
[[OSE Contributor Agreement]]. | [[OSE Contributor Agreement]]. | ||
=Sun Jul 28, 2013= | = Sun Jul 28, 2013 = | ||
Began [[Q3 Plan]]. | Began [[Q3 Plan]]. | ||
=Sat Jul 27, 2013= | = Sat Jul 27, 2013 = | ||
Design Sprint Day. Highlight: Engineers for a Sustainable World collaboration - director Alexander Dale showed up, ready to collaborate through University chapters. Can help us set up OSE presence or chapters at universities. Sprint beginning - [[Module - Digital Signal Processor]]. Sprint result - [[Module - CNC Torch Height Control]]. Started [[Growing the True Fans Human Ecology]]. [[Permafacture Design Course]]. | Design Sprint Day. Highlight: Engineers for a Sustainable World collaboration - director Alexander Dale showed up, ready to collaborate through University chapters. Can help us set up OSE presence or chapters at universities. Sprint beginning - [[Module - Digital Signal Processor]]. Sprint result - [[Module - CNC Torch Height Control]]. Started [[Growing the True Fans Human Ecology]]. [[Permafacture Design Course]]. | ||
=Fri Jul 26, 2013= | = Fri Jul 26, 2013 = | ||
Katie started [[Development Template]]. [[Christopher Reinhart]] exploring [[Brick Stacking Patterns]] for Microhouse. [[Action Item Tracker]]. Created [[Video and Graphics Team]] page. Started [[Module - Torch Height Controller]]. [[Development Process Plan]] | Katie started [[Development Template]]. [[Christopher Reinhart]] exploring [[Brick Stacking Patterns]] for Microhouse. [[Action Item Tracker]]. Created [[Video and Graphics Team]] page. Started [[Module - Torch Height Controller]]. [[Development Process Plan]] | ||
=Thu Jul 25, 2013= | = Thu Jul 25, 2013 = | ||
All day of team discussions - prototyping planning. First ever google hangout for True Fans tonight. See [[True Fans Hangout]] | All day of team discussions - prototyping planning. First ever google hangout for True Fans tonight. See [[True Fans Hangout]] | ||
=Wed Jul 24, 2013= | = Wed Jul 24, 2013 = | ||
Working on [[GVCS Documentation Template]] and breaking machines into [[GVCS Modules]] with Rob, Katie, and Jean. Katie driving the documentation forward as in [[LifeTrac 6]] as case example. [[Mecoconcept]] manually loaded brick press. Discussing [[OSE Local Groups]] with Sam Turner. One True Fan drew up [[Open Source Hardware and Local Communities]] presentation. Preparing first Google Hangout with [[True Fans]] community. [[Owned and Operated]] features OSE at minute 8:36. | |||
= | = Tue Jul 23, 2013 = | ||
=Wed Jul 17, 2013= | Decided on sample template for machines as Infographic - Modules - Interfaces and List of Modules - [http://opensourceecology.dozuki.com/c/CNC_Circuit_Mill [1]].James working on 50 hp Power Cube - [[Power Cube WS]]. Started [[LifeTrac 5]] page. | ||
= Monday Jul 22, 2013 = | |||
Planning week. Talked to [[Catherine Austin-Fitts]]. Katie did [https://docs.google.com/a/opensourceecology.org/drawings/d/1xJccDBGqxZPDwPYf8yYkR4rtZ-s7n0mW5mL4iOopf_4/edit https://docs.google.com/a/opensourceecology.org/drawings/d/1xJccDBGqxZPDwPYf8yYkR4rtZ-s7n0mW5mL4iOopf_4/edit] . '''Goal for Week: (1) put 6 month plan in Project Manager, (2) prepare design sprint and get up to 24 people in Sprint; (3) Break each machine into placeholders for Modules, Interfaces, and Individual modules. (4) Upadate True Fans database and host first True Fan hangout.''' | |||
= Wed Jul 17, 2013 = | |||
= Tue Jul 16, 2013 = | |||
[[Jesse's 3D Scanning Page]]. Talked to [[Chris Reinhart]] about [[OSE Microhouse Build]], + [[John Motloch]] and [[Scott Truax]]. Composing [[Prototype Assessment]]. Requesting [[LifeTrac 5 Prototype Asessment]] from Gary. [[Frictional Stir Welding]]. | [[Jesse's 3D Scanning Page]]. Talked to [[Chris Reinhart]] about [[OSE Microhouse Build]], + [[John Motloch]] and [[Scott Truax]]. Composing [[Prototype Assessment]]. Requesting [[LifeTrac 5 Prototype Asessment]] from Gary. [[Frictional Stir Welding]]. | ||
=Mon Jul 15, 2013= | = Mon Jul 15, 2013 = | ||
Begining definitions of OSE Local Groups - [[Guidelines for Use of the OSE Name]]. Beginning [[July 20 Sprint Planning]] - to write our a schedule by today. '''Week Goals: Draw up [[LifeTrac 5]] budget. Prepare first detailed Sprint Schedule. Plan a trip to [[OSBG]]. Fill roster with 12 DPVs. Increase [[Design Sprint Participation Numbers]] by 20.''' [[FoldaRep]]. Talked to [[Jenn Gustetic]]. [[Topcoder]]. [[Sample Robot Return Challenge]]. Talked to [[Robert Davis Steele]]. [[CNC Cut Furniture]]. | Begining definitions of OSE Local Groups - [[Guidelines for Use of the OSE Name]]. Beginning [[July 20 Sprint Planning]] - to write our a schedule by today. '''Week Goals: Draw up [[LifeTrac 5]] budget. Prepare first detailed Sprint Schedule. Plan a trip to [[OSBG]]. Fill roster with 12 DPVs. Increase [[Design Sprint Participation Numbers]] by 20.''' [[FoldaRep]]. Talked to [[Jenn Gustetic]]. [[Topcoder]]. [[Sample Robot Return Challenge]]. Talked to [[Robert Davis Steele]]. [[CNC Cut Furniture]]. | ||
=Sat-Sun, Jul 13-14, 2013= | = Sat-Sun, Jul 13-14, 2013 = | ||
Nat Turner adventure at FeF. Still building. [[Public Relations Package]]. [[John Fazzini]] letter. | Nat Turner adventure at FeF. Still building. [[Public Relations Package]]. [[John Fazzini]] letter. | ||
=Fri Jul 12, 2013= | = Fri Jul 12, 2013 = | ||
Approving week's blog post and beginning role division for [[The Spark Build]] - one day production run of the tractor. [[General Rules of Open Source Organizations]]. | Approving week's blog post and beginning role division for [[The Spark Build]] - one day production run of the tractor. [[General Rules of Open Source Organizations]]. | ||
=Thu Jul 11, 2013= | = Thu Jul 11, 2013 = | ||
[[The Spark Build]] quality control. [[Nat Turner]] arrived. Major player, don't know anyone more committed on deep localization solutions. | [[The Spark Build]] quality control. [[Nat Turner]] arrived. Major player, don't know anyone more committed on deep localization solutions. | ||
=Wed Jul 10, 2013= | = Wed Jul 10, 2013 = | ||
[[100km on 1 Liter]]. | [[100km on 1 Liter]]. | ||
=Sun Jul 7, 2013= | = Sun Jul 7, 2013 = | ||
[[Power Cube Development Matrix]] started after [[LifeTrac Development Matrix]]. | [[Power Cube Development Matrix]] started after [[LifeTrac Development Matrix]]. | ||
=Sat Jul 6, 2013= | = Sat Jul 6, 2013 = | ||
Design Sprint. Laser Diode design ready for part sourcing. OS Car drive ready for review. CNC Torch table system diagram in progress, decided upon acetylene torch as step 1. Progress on populating [[Dozuki]] with modules. | Design Sprint. Laser Diode design ready for part sourcing. OS Car drive ready for review. CNC Torch table system diagram in progress, decided upon acetylene torch as step 1. Progress on populating [[Dozuki]] with modules. | ||
=Fri Jul 5, 2013= | = Fri Jul 5, 2013 = | ||
[[Sample Dozuki Embed]] | [[Sample Dozuki Embed]] | ||
=Fri Jul 5, 2013= | = Fri Jul 5, 2013 = | ||
Took 50 hp engine to get it running. | Took 50 hp engine to get it running. | ||
=Thu Jul 4, 2013= | = Thu Jul 4, 2013 = | ||
Rest day from [[6 in 60 Documentation]]. Scheming to the relevance of 3D printing as a critical, not luxury, aspect of machine prototyping. [[Straw Board]] reference from Scott Truax and [[John Motloch]]. Saw another of the [[Video Feeds on OSE]] from Post Growth Institute. | Rest day from [[6 in 60 Documentation]]. Scheming to the relevance of 3D printing as a critical, not luxury, aspect of machine prototyping. [[Straw Board]] reference from Scott Truax and [[John Motloch]]. Saw another of the [[Video Feeds on OSE]] from Post Growth Institute. | ||
=Wed Jul 3, 2013= | = Wed Jul 3, 2013 = | ||
Redesigned final integration details on backhoe, and assembling pivot to stabilizer legs, boom, stick and tractor mount. [[Next Culture Research and Training Center]]. [[Open Source Appropriate Technologies Paper]]. [[Open Source Alternative to Matlab]]. Planning our first scheduled Design Sprint - [[Design Sprint - Jul 6, 2013]]. [[LifeTrac Development Matrix]]. | Redesigned final integration details on backhoe, and assembling pivot to stabilizer legs, boom, stick and tractor mount. [[Next Culture Research and Training Center]]. [[Open Source Appropriate Technologies Paper]]. [[Open Source Alternative to Matlab]]. Planning our first scheduled Design Sprint - [[Design Sprint - Jul 6, 2013]]. [[LifeTrac Development Matrix]]. | ||
=Tue Jul 2, 2013= | = Tue Jul 2, 2013 = | ||
Struggling with integration detail on Backhoe. Lack of scale prototype and step-by-step procedure means we are figuring things out on the fly for details of fit - thereby extending build time by a day. Main pivot was assembled. Requires careful step-by-step in order to do it on the first try. | Struggling with integration detail on Backhoe. Lack of scale prototype and step-by-step procedure means we are figuring things out on the fly for details of fit - thereby extending build time by a day. Main pivot was assembled. Requires careful step-by-step in order to do it on the first try. | ||
=Mon July 1, 2013= | = Mon July 1, 2013 = | ||
Swarming on Backhoe and Ironworker build today. Ironworker: pivot plates, blade mount, cylinder mount, cut shaft, and done. Backhoe: bucket attach, boom and stick drilling, cutting of rest of materials, building pivot, cutting shaft, attaching cylinders, adding QA mount, making pins. On Bulldozer Geardown - need to drill out keyways. Need mills. Sweiger: belt. refining [[Design Sprint# | |||
Swarming on Backhoe and Ironworker build today. Ironworker: pivot plates, blade mount, cylinder mount, cut shaft, and done. Backhoe: bucket attach, boom and stick drilling, cutting of rest of materials, building pivot, cutting shaft, attaching cylinders, adding QA mount, making pins. On Bulldozer Geardown - need to drill out keyways. Need mills. Sweiger: belt. refining [[Design Sprint#Design Process]] | |||
=Older Entries= | = Older Entries = | ||
*[[Marcin Log - June 2013]] - Sprinting | *[[Marcin Log - June 2013]] - Sprinting | ||
*[[Marcin Log - May 2013]] - Rough Taste of Freedom | *[[Marcin Log - May 2013]] - Rough Taste of Freedom | ||
Line 91: | Line 116: | ||
*[[Marcin Log - January 2013]] - The Next Phase | *[[Marcin Log - January 2013]] - The Next Phase | ||
*[[Marcin Log - December 2012]] - Time for the [[Christmas Gift to the World]] | *[[Marcin Log - December 2012]] - Time for the [[Christmas Gift to the World]] | ||
*[[Marcin Log - November 2012]] - Stabilizing | *[[Marcin Log - November 2012]] - Stabilizing | ||
*[[Marcin Log - October 2012]] - Heating Up for Winter | *[[Marcin Log - October 2012]] - Heating Up for Winter | ||
*[[Marcin Log - September 2012]] - Collaboratorium. Back to logging Sep. 13, 2012 | *[[Marcin Log - September 2012]] - Collaboratorium. Back to logging Sep. 13, 2012 | ||
Line 103: | Line 128: | ||
*[[Marcin Log - January 2012]] | *[[Marcin Log - January 2012]] | ||
*[[Marcin Log - 2011]] | *[[Marcin Log - 2011]] | ||
[[ | [https://docs.google.com/document/d/1ME6zJZHuMQLnfNw9rFZFzp4eHjkFXjuKgdL9hPY6fqA/edit [2]] |
Revision as of 18:49, 1 August 2013
see Work Log for howto.
Thu Aug 1, 2013
Open Source License Compliance Audit for software in manufacturing.
Wed Jul 31, 2013
Started Development Templates.
Mon Jul 29, 2013
Sun Jul 28, 2013
Began Q3 Plan.
Sat Jul 27, 2013
Design Sprint Day. Highlight: Engineers for a Sustainable World collaboration - director Alexander Dale showed up, ready to collaborate through University chapters. Can help us set up OSE presence or chapters at universities. Sprint beginning - Module - Digital Signal Processor. Sprint result - Module - CNC Torch Height Control. Started Growing the True Fans Human Ecology. Permafacture Design Course.
Fri Jul 26, 2013
Katie started Development Template. Christopher Reinhart exploring Brick Stacking Patterns for Microhouse. Action Item Tracker. Created Video and Graphics Team page. Started Module - Torch Height Controller. Development Process Plan
Thu Jul 25, 2013
All day of team discussions - prototyping planning. First ever google hangout for True Fans tonight. See True Fans Hangout
Wed Jul 24, 2013
Working on GVCS Documentation Template and breaking machines into GVCS Modules with Rob, Katie, and Jean. Katie driving the documentation forward as in LifeTrac 6 as case example. Mecoconcept manually loaded brick press. Discussing OSE Local Groups with Sam Turner. One True Fan drew up Open Source Hardware and Local Communities presentation. Preparing first Google Hangout with True Fans community. Owned and Operated features OSE at minute 8:36.
Tue Jul 23, 2013
Decided on sample template for machines as Infographic - Modules - Interfaces and List of Modules - [1].James working on 50 hp Power Cube - Power Cube WS. Started LifeTrac 5 page.
Monday Jul 22, 2013
Planning week. Talked to Catherine Austin-Fitts. Katie did https://docs.google.com/a/opensourceecology.org/drawings/d/1xJccDBGqxZPDwPYf8yYkR4rtZ-s7n0mW5mL4iOopf_4/edit . Goal for Week: (1) put 6 month plan in Project Manager, (2) prepare design sprint and get up to 24 people in Sprint; (3) Break each machine into placeholders for Modules, Interfaces, and Individual modules. (4) Upadate True Fans database and host first True Fan hangout.
Wed Jul 17, 2013
Tue Jul 16, 2013
Jesse's 3D Scanning Page. Talked to Chris Reinhart about OSE Microhouse Build, + John Motloch and Scott Truax. Composing Prototype Assessment. Requesting LifeTrac 5 Prototype Asessment from Gary. Frictional Stir Welding.
Mon Jul 15, 2013
Begining definitions of OSE Local Groups - Guidelines for Use of the OSE Name. Beginning July 20 Sprint Planning - to write our a schedule by today. Week Goals: Draw up LifeTrac 5 budget. Prepare first detailed Sprint Schedule. Plan a trip to OSBG. Fill roster with 12 DPVs. Increase Design Sprint Participation Numbers by 20. FoldaRep. Talked to Jenn Gustetic. Topcoder. Sample Robot Return Challenge. Talked to Robert Davis Steele. CNC Cut Furniture.
Sat-Sun, Jul 13-14, 2013
Nat Turner adventure at FeF. Still building. Public Relations Package. John Fazzini letter.
Fri Jul 12, 2013
Approving week's blog post and beginning role division for The Spark Build - one day production run of the tractor. General Rules of Open Source Organizations.
Thu Jul 11, 2013
The Spark Build quality control. Nat Turner arrived. Major player, don't know anyone more committed on deep localization solutions.
Wed Jul 10, 2013
Sun Jul 7, 2013
Power Cube Development Matrix started after LifeTrac Development Matrix.
Sat Jul 6, 2013
Design Sprint. Laser Diode design ready for part sourcing. OS Car drive ready for review. CNC Torch table system diagram in progress, decided upon acetylene torch as step 1. Progress on populating Dozuki with modules.
Fri Jul 5, 2013
Fri Jul 5, 2013
Took 50 hp engine to get it running.
Thu Jul 4, 2013
Rest day from 6 in 60 Documentation. Scheming to the relevance of 3D printing as a critical, not luxury, aspect of machine prototyping. Straw Board reference from Scott Truax and John Motloch. Saw another of the Video Feeds on OSE from Post Growth Institute.
Wed Jul 3, 2013
Redesigned final integration details on backhoe, and assembling pivot to stabilizer legs, boom, stick and tractor mount. Next Culture Research and Training Center. Open Source Appropriate Technologies Paper. Open Source Alternative to Matlab. Planning our first scheduled Design Sprint - Design Sprint - Jul 6, 2013. LifeTrac Development Matrix.
Tue Jul 2, 2013
Struggling with integration detail on Backhoe. Lack of scale prototype and step-by-step procedure means we are figuring things out on the fly for details of fit - thereby extending build time by a day. Main pivot was assembled. Requires careful step-by-step in order to do it on the first try.
Mon July 1, 2013
Swarming on Backhoe and Ironworker build today. Ironworker: pivot plates, blade mount, cylinder mount, cut shaft, and done. Backhoe: bucket attach, boom and stick drilling, cutting of rest of materials, building pivot, cutting shaft, attaching cylinders, adding QA mount, making pins. On Bulldozer Geardown - need to drill out keyways. Need mills. Sweiger: belt. refining Design Sprint#Design Process
Older Entries
- Marcin Log - June 2013 - Sprinting
- Marcin Log - May 2013 - Rough Taste of Freedom
- Marcin Log - April 2013 - OSE 2.0 Beginning
- Marcin Log - March 2013 - End of Slumber
- Marcin Log - February 2013 - Operations Manager Recruiting
- Marcin Log - January 2013 - The Next Phase
- Marcin Log - December 2012 - Time for the Christmas Gift to the World
- Marcin Log - November 2012 - Stabilizing
- Marcin Log - October 2012 - Heating Up for Winter
- Marcin Log - September 2012 - Collaboratorium. Back to logging Sep. 13, 2012
- Marcin Log - August 2012 - chaos
- Marcin Log - July 2012 - exile
- Marcin Log - June 2012 - heat
- Marcin Log - May 2012
- Marcin Log - April 2012
- Marcin Log - March 2012
- Marcin Log - February 2012
- Marcin Log - January 2012
- Marcin Log - 2011
[2]