[[2513 Bricks]] stacked for OSE Microhouse. See [[Chris_Reinhart_Log#Wed_Morn.2C_Oct_2.2C_2013]].
[[2513 Bricks]] stacked for OSE Microhouse. See [[Chris_Reinhart_Log#Wed_Morn.2C_Oct_2.2C_2013]].
=Mon Sep 30, 2013=
Microhouse CEB floor today. Talking to [[Tudor Tarlev]].
=Sun Sep 29, 2013=
'''[[Rototiller and Soil Pulverizer Development Board]]'''. Microhouse Build - pressing bricks - [[Soil Pulverizer at Work on the Microhouse]]. See [[Chris_Reinhart_Log#Sun_Eve.2C_Sep_29.2C_2013]] for action.
=Sat Sep 28, 2013=
Microhouse build - rain so [[Microhouse Utility Module Build]] indoors, loft, door and window modules being worked. Fixing curl cylinder mounting on LifeTrac 6 - . Wrote [[Standard Collaboration Response for the Last Mile]]. Adding to design of [[LifeTrac_6_Hydraulics_-_Concept_Diagram]].
=Fri Sep 27, 2013=
Planning meeting - Microhouse Build - shop organization, pressing bricks. [[Discussion with Ajay Jagtiani]], IP Lawyer. Started '''[[LifeTrac 6 - Development Board]]'''.
=Thu Sep 26, 2013=
[[Kansas City Open Hardware Group]]. Hydraulics tool all day yesterday - plug and play 2 and 4 wheel drive, scalability to 3 and 4 power cubes. Getting LifeTrac 4 to bring brick press up to site while [[Lucas Log]] finishes hydraulics. Started '''[[CEB Press - Controller - Development Board]]'''. [[Cultural Revolution]]. Done [[Moving Brick Press 1 into Place 2013]]. [[100km 1litro]] went open source!
=Wed Sep 25, 2013=
Concrete foundation pour today ([[Chris_Reinhart_Log#Wed_Sep_25.2C_2013]]) + mounting soil pulverizer on new tractor + pressing first bricks with new tractor and brick press. Getting Lucas to help. [[Jennifer Urban]] as potential board Member.
=Tue Sep 24, 2013=
Started '''[[Power Cube - Development Board]]'''. Ordered concrete for foundation pour - tomorrow.
=Mon Sep 23, 2013=
Gravel for foundation a rriving 9 AM. Putting in forms today, pouring tomorrow. [[Ground Rules of Social Entrepreneurship]]. Prepared [[Microhouse Foundation Forms]]. -
=Sat Sep 20, 2013=
[[Design Sprint]] from 9AM to 1PM. '''[[Critical Dev Path v9/21/13]]'''. [[Stepper Motor Controller - Module Diagram]]. [[Sketchup to Animation Protocol]]. Driving time from NYC to Maysville, Missouri - 18 hours 1 minute. [[Design Sprint and DPV Recruiting Plan]]. [[Microhouse Foundation and Piping Cross Section]]. '''[[CEB Press Development Board]]'''. Cheryl Dorsey - Echoing Green President - SEQ - [[Social Entrepreneurial Intelligence]].
=Fri Sep 20, 2013=
Started [[Backhoe Side to Side Pivot Module]]. [[DPV Tracker]].'''[[Microcombine Development Board]].''' Use [[Coggle]] for [[Tech Tree of Choices]]. '''[[Microhouse Development Board]]'''. [[Critical Development Path v9/20/13]]. [[Chart, Diagram, and Flowchart Tools]].
=Thu Sep 19, 2013=
[[LifeTrac 6 Modular Wheel Units - Assembly Procedure]]. [[LifeTrac 6 Hydraulics - Concept Diagram]]. Started [[LifeTrac 6 Hydraulics]] module page, linked to dozuki. [[Shuttleworth Discussion on Storytelling]]. [[Parkinson's Law of Trivialty]]. '''[[OSE Lasersaur]]''' dashboard started.
=Wed Sep 18, 2013=
Filled in [[LifeTrac 6 Modular Wheel Units Production Time Data]]. Started [[Operations - Site Maintenance]]. Started [[Operations - Budget Reporting]]. [[3D File Diffs on Github]]. [[LifeTrac 6 Modular Wheel Units - Visual Bill of Materials]]. [[LifeTrac 6 Modular Wheel Units - Assembly]].
=Tue Sep 17, 2013=
Started [[Purchases]] tracker. Continuing [[LifeTrac 6 Modular Wheel Units]]. [[Critical Path in Project Manager]]. Inventoried and secured remaining parts for Modular Wheel Units. Did total of 12 hours in the workshop including cutting/milling/drilling materials for Modular Wheel Units - see [[LifeTrac 6 Modular Wheel Units Production Time Data]]
=Mon Sep 16, 2013=
Continuing [[LifeTrac 6 Build Critical Path]]. Beginning on [[Lasersaur Build]] preparations. Started [[LifeTrac 6 Modular Wheel Units]]. Started [[Universal_Rotor_Commit_Log]].
=Sun Sep 15, 2013=
Started [[LifeTrac 6 Build Checklist]].
=Sat Sep 14, 2013=
Continuing [[Open Hardware Development Critical Path]]. Started [[LifeTrac Construction Set Video Script]]. Started [[Contributor Log]]. Updated [[Universal Rotor Construction Set]]. [[Tilting Suspension]]. [[Universal Mobility Construction Set]]. Open law from France - [[Sharelex]]. Cleared Microhouse Site - [[Chris_Reinhart_Log#Sat_Sep_14.2C_2013]]. Continuing [[Open Hardware Development Critical Path]].
=Fri Sep 13, 2013=
[[LifeTrac 6 Deliverables Board]]. [[Katie's Bookmarks]]. [[Exploded Part Diagrams]]. Revamping [[Critical Path for Development]]. [[OSH Development Critical Path - Secondary]]. [[Open Hardware Development Critical Path]]. Continuing [[Development Protocols Needs]]. [[Water Line North]].
=Thu Sep 12, 2013=
[[Graphical Tools Template]]. Getting ready to clear brush off construction site, source foundation materials, and ready the trencher [[Trencher Prototype 1 Video]] for its first real use after modification to new Universal Rotor. [[OSE Rapid Prototyping]]. See [[CAD File Formats from GrabCAD]]. [[Favorite Quotations]].
Updating [[Development Method Summary]] and discussed LifeTrac 6 [[Master Quality Control Checklist]] with [[Gary Log]] + [[Lucas Log]] + [[Dorkmo Log]]. Had [[Routine Executive Staff Meeting]]. Discussion with [[Karien on New Project Pitch]]. [[First Meeting with Catherine Austin Fitts]]. [[Founder Dating]]. '''[[Mass Rollout]]. [[Universal Rotor Construction Set]]'''. [[Phonebloks]].
=Mon Sep 9, 2013=
Reviewing materials order, and working on [[Development Method Summary]]. [[Open Accelerator]].
=Mon Sep 9, 2013=
Reviewing materials order, and working on [[Development Method Summary]]. [[Open Accelerator]].
=Thu Sep 5, 2013=
At [[OHS 2013]]. Potential followthroughs on [[Lasersaur]] build, stepper controller finalization, 100km with 1 liter car, One Day Design Sprint - car as model for 4 days of design sprint from 0 to finalization with 0 entry barrier. Potential village pilot in Egypt. Potential keynote in Colombia. Alicia on board.
=Wed Sep 4, 2013=
Did [[Budget]] with Katie. Discussed goals until end of October with Catherine. Preparing for Open Hardware Summit. Docuementing [[CEB Press Pressure Switch Controller]] with [[James Log]].
=Tue Sep 3, 2013=
Submitting [[OHS Presentation]]. Defining [[OSE License Requirements]]. Updating [[FAQ]]. [[Protocols in Progress]]. [[Development Process Graphic]].
=Mon Sep 2, 2013=
[[OHS Presentation]]. Reviewing [[Master Product Development Board]] and reframing around deliverables in [[2013 Development Template - Towards Completion]].
Proposal: build of Backhoe Pivot on Sat starting 10 AM. Fab Instructions (Dan, Cody) -> BOM (Dan, Cody) -> Video Script (Rob) -> Shot List (Rob)-> All Day Time Lapse, phone (MJ)-> All day Pro Timelapse (Emmett) -> Assembly Animation (to match Shot List, Need to recruit a person; spec: doable in 1 day, needs instructional) -> Trovebox -> Dozuki Instructional -> Connexions -> Youtube Timelapse in realtime. This could be the first real case of real-time documentation up to a printed, remixable manual. If we aren't ready Sat, do it Monday. Software version control animation - Gource.