= Wed Jul 31, 2013 =


Started [[Development Templates]].
= Mon Jul 29, 2013 =
[[OSE Contributor Agreement]].
= Sun Jul 28, 2013 =
Began [[Q3 Plan]].
= Sat Jul 27, 2013 =
New Orleans visit at [[OSBG]] - tractor pilot project - see [[LifeTrac 5]]. Design Sprint Day. Highlight: Engineers for a Sustainable World collaboration - director Alexander Dale showed up, ready to collaborate through University chapters. Can help us set up OSE presence or chapters at universities. Sprint beginning - [[Module - Digital Signal Processor]]. Sprint result - [[Module - CNC Torch Height Control]]. Started [[Growing the True Fans Human Ecology]]. [[Permafacture Design Course]].
= Fri Jul 26, 2013 =
Katie started [[Development Template]]. [[Christopher Reinhart]] exploring [[Brick Stacking Patterns]] for Microhouse. [[Action Item Tracker]]. Created [[Video and Graphics Team]] page. Started [[Module - Torch Height Controller]]. [[Development Process Plan]]
= Thu Jul 25, 2013 =
All day of team discussions - prototyping planning. First ever google hangout for True Fans tonight. See [[True Fans Hangout]]
= Wed Jul 24, 2013 =
Working on [[GVCS Documentation Template]] and breaking machines into [[GVCS Modules]] with Rob, Katie, and Jean. Katie driving the documentation forward as in [[LifeTrac 6]] as case example. [[Mecoconcept]] manually loaded brick press. Discussing [[OSE Local Groups]] with Sam Turner. One True Fan drew up [[Open Source Hardware and Local Communities]] presentation. Preparing first Google Hangout with [[True Fans]] community. [[Owned and Operated]] features OSE at minute 8:36.
= Tue Jul 23, 2013 =
Decided on sample template for machines as Infographic - Modules - Interfaces and List of Modules - [http://opensourceecology.dozuki.com/c/CNC_Circuit_Mill [1]].James working on 50 hp Power Cube - [[Power Cube WS]]. Started [[LifeTrac 5]] page.
= Monday Jul 22, 2013 =
Planning week. Talked to [[Catherine Austin-Fitts]]. Katie did [https://docs.google.com/a/opensourceecology.org/drawings/d/1xJccDBGqxZPDwPYf8yYkR4rtZ-s7n0mW5mL4iOopf_4/edit https://docs.google.com/a/opensourceecology.org/drawings/d/1xJccDBGqxZPDwPYf8yYkR4rtZ-s7n0mW5mL4iOopf_4/edit] . '''Goal for Week: (1) put 6 month plan in Project Manager, (2) prepare design sprint and get up to 24 people in Sprint; (3) Break each machine into placeholders for Modules, Interfaces, and Individual modules. (4) Upadate True Fans database and host first True Fan hangout.'''
= Wed Jul 17, 2013 =
= Tue Jul 16, 2013 =
[[Jesse's 3D Scanning Page]]. Talked to [[Chris Reinhart]] about [[OSE Microhouse Build]], + [[John Motloch]] and [[Scott Truax]]. Composing [[Prototype Assessment]]. Requesting [[LifeTrac 5 Prototype Asessment]] from Gary. [[Frictional Stir Welding]].
= Mon Jul 15, 2013 =
Begining definitions of OSE Local Groups - [[Guidelines for Use of the OSE Name]]. Beginning [[July 20 Sprint Planning]] - to write our a schedule by today. '''Week Goals: Draw up [[LifeTrac 5]] budget. Prepare first detailed Sprint Schedule. Plan a trip to [[OSBG]]. Fill roster with 12 DPVs. Increase [[Design Sprint Participation Numbers]] by 20.''' [[FoldaRep]]. Talked to [[Jenn Gustetic]]. [[Topcoder]]. [[Sample Robot Return Challenge]]. Talked to [[Robert Davis Steele]]. [[CNC Cut Furniture]].
= Sat-Sun, Jul 13-14, 2013 =
Nat Turner adventure at FeF. Still building. [[Public Relations Package]]. [[John Fazzini]] letter.
= Fri Jul 12, 2013 =
Approving week's blog post and beginning role division for [[The Spark Build]] - one day production run of the tractor. [[General Rules of Open Source Organizations]].
= Thu Jul 11, 2013 =
[[The Spark Build]] quality control. [[Nat Turner]] arrived. Major player, don't know anyone more committed on deep localization solutions.
= Wed Jul 10, 2013 =
[[100km on 1 Liter]].
= Sun Jul 7, 2013 =
[[Power Cube Development Matrix]] started after [[LifeTrac Development Matrix]].
= Sat Jul 6, 2013 =
Design Sprint. Laser Diode design ready for part sourcing. OS Car drive ready for review. CNC Torch table system diagram in progress, decided upon acetylene torch as step 1. Progress on populating [[Dozuki]] with modules.
= Fri Jul 5, 2013 =
[[Sample Dozuki Embed]]
= Fri Jul 5, 2013 =
Took 50 hp engine to get it running.
= Thu Jul 4, 2013 =
Rest day from [[6 in 60 Documentation]]. Scheming to the relevance of 3D printing as a critical, not luxury, aspect of machine prototyping. [[Straw Board]] reference from Scott Truax and [[John Motloch]]. Saw another of the [[Video Feeds on OSE]] from Post Growth Institute.
= Wed Jul 3, 2013 =
Redesigned final integration details on backhoe, and assembling pivot to stabilizer legs, boom, stick and tractor mount. [[Next Culture Research and Training Center]]. [[Open Source Appropriate Technologies Paper]]. [[Open Source Alternative to Matlab]]. Planning our first scheduled Design Sprint - [[Design Sprint - Jul 6, 2013]]. [[LifeTrac Development Matrix]].
= Tue Jul 2, 2013 =
Struggling with integration detail on Backhoe. Lack of scale prototype and step-by-step procedure means we are figuring things out on the fly for details of fit - thereby extending build time by a day. Main pivot was assembled. Requires careful step-by-step in order to do it on the first try.
= Mon July 1, 2013 =
Swarming on Backhoe and Ironworker build today. Ironworker: pivot plates, blade mount, cylinder mount, cut shaft, and done. Backhoe: bucket attach, boom and stick drilling, cutting of rest of materials, building pivot, cutting shaft, attaching cylinders, adding QA mount, making pins. On Bulldozer Geardown - need to drill out keyways. Need mills. Sweiger: belt. refining [[Design Sprint#Design Process]]





Revision as of 03:44, 8 August 2013

see Work Log for howto.

Wed Aug 7, 2013

CEB Press Genealogy. InterLace - commons-based peer production with video. Google Drawing Template. ZoomRP. Initial microhouse concept discussion with Chris - Chris_Reinhart_Log#Concept_drawing_thoughts. Updated Blogging Standards for technical blog posts such as invited to Tim Log for 10W laser cutter. Going over Project Manager Tutorials. Rob is looking for Google_Hangout_Alternative. Limit in hangout is 10 or 15 peeps. First use of Contractor IP Agreement with Independent Contractor Template. James got CEB Controller schematic in Upverter, and began BOM - James_Slade_Log#Thu_Aug_8.2C_2013

Tue Aug 6, 2013

Beginning LifeTrac 6 design and development. Team Microhouse Discussion.

Sun Aug 4, 2013

Jung Typology Test.

Sat Aug 3, 2013

Design Sprint - Development_Status_and_Needs#Sat_Aug_3.2C_2013_Plan. Torch Height Controller ready for build - Paul Log. 270 modules put up on Dozuki. Open Source Power Electronics Construction Set Diagram. Need to start CEB Press 6 Development Matrix.

Fri Aug 2, 2013

Critical Path Template. Embedded GVCS Comparison to Industry Standards. Updated OSE Specifications for Product Design.

Thu Aug 1, 2013

Microhouse Build Planning. Open Source License Compliance Audit for software in manufacturing. Refined to Development Template 2.