Marcin Log: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 8: Line 8:


=Thu Aug 8, 2013=
=Thu Aug 8, 2013=
Updated process part of [[OSE_Specifications_for_Product_Design]]. Dev template clarity discussion with Katie. Found about [[Solidoodle]]-printed car - [[Solidoodle Car]]. Refining the [[Flashy XM]] Control Panel development process to current process based on 6 in 60 and LifeTrac 5 experiences with Module-Based design to yield [[August 2013 Development Template]].
Updated process part of [[OSE_Specifications_for_Product_Design]]. Dev template clarity discussion with Katie. Found about [[Solidoodle]]-printed car - [[Solidoodle Car]]. Refining the [[Flashy XM]] Control Panel development process to current process based on 6 in 60 and LifeTrac 5 experiences with Module-Based design to yield [[August 2013 Development Template]]. [[Design Sprint CRM Platform]].


=Wed Aug 7, 2013=
=Wed Aug 7, 2013=

Revision as of 01:06, 9 August 2013

see Work Log for howto.

Thu Aug 8, 2013

Updated process part of OSE_Specifications_for_Product_Design. Dev template clarity discussion with Katie. Found about Solidoodle-printed car - Solidoodle Car. Refining the Flashy XM Control Panel development process to current process based on 6 in 60 and LifeTrac 5 experiences with Module-Based design to yield August 2013 Development Template. Design Sprint CRM Platform.

Wed Aug 7, 2013

CEB Press Genealogy. InterLace - commons-based peer production with video. Google Drawing Template. ZoomRP. Initial microhouse concept discussion with Chris - Chris_Reinhart_Log#Concept_drawing_thoughts. Updated Blogging Standards for technical blog posts such as invited to Tim Log for 10W laser cutter. Going over Project Manager Tutorials. Rob is looking for Google_Hangout_Alternative. Limit in hangout is 10 or 15 peeps. First use of Contractor IP Agreement with Independent Contractor Template. James got CEB Controller schematic in Upverter, and began BOM - James_Slade_Log#Thu_Aug_8.2C_2013. Second True Fans Hangout invite.

Tue Aug 6, 2013

Beginning LifeTrac 6 design and development. Team Microhouse Discussion.

Sun Aug 4, 2013

Jung Typology Test.

Sat Aug 3, 2013

Design Sprint - Development_Status_and_Needs#Sat_Aug_3.2C_2013_Plan. Torch Height Controller ready for build - Paul Log. 270 modules put up on Dozuki. Open Source Power Electronics Construction Set Diagram. Need to start CEB Press 6 Development Matrix.

Fri Aug 2, 2013

Critical Path Template. Embedded GVCS Comparison to Industry Standards. Updated OSE Specifications for Product Design.

Thu Aug 1, 2013

Microhouse Build Planning. Open Source License Compliance Audit for software in manufacturing. Refined to Development Template 2.