Thu Oct 10, 2013
Proposal: build of Backhoe Pivot on Sat starting 10 AM. Fab instructions -> Shot List -> Trovebox -> Dozuki instructional -> Connexions in realtime. This could be the first real case of real-time documentation. If we aren't ready Sat, do it Monday. Bolt prep: 10-11. Tubing prep: 11-12. Pivot plates prep: 12-1. 1-7 - pivot build.
Wed Oct 9, 2013
Finishing Weekly Cash Flow. Set up Ironworker Deliverables Board, also found at Dozuki. Started Microcombine Development Board. Started Microcombine Reel Module - Development Board, Microcombine Auger Module - Development Board, Microcombine Feeder Module - Development Board, Microcombine Threshing Drum Module - Development Board, Microcombine Header Sickle Bar Module - Development Board, Microcombine Straw Sickle Bar Module - Development Board, Microcombine Drive Module - Development Board, Microcombine Frame Module - Development Board, Microcombine Winnower Module - Development Board. Did Microhouse Prototype Assessment. Doing final report for the Kauffman Foundation Grant Final Report. Publishing Assembly Animation Sample.
Tue Oct 8, 2013
Sketchup to Animated Assembly Videos. Discussed Get Involved with Karien.
Mon Oct 7, 2013
Began Backhoe and Ironworker class and development. Planning roof finish for Thu, and stove finish for Sat. Weekly Cash Flow. Updated Backhoe_Side_to_Side_Pivot_Module. Started Backhoe Development Board.
Sun Oct 6, 2013
Started CNC Torch and Router Table Development Board but can't post to Dozuki because of error on Torch Table location only.
Sat Oct 5, 2013
Design Sprint - Development_Status_and_Needs#Sat.2C_Oct_5.2C_2013_Plan.
Fri Oct 4, 2013
Putting the roof sections on Microhouse - Chris_Reinhart_Log#Fri_Oct_4.2C_2013.
Thu Oct 3, 2013
Wed Oct 2, 2013
2513 Bricks stacked for OSE Microhouse. See Chris_Reinhart_Log#Wed_Morn.2C_Oct_2.2C_2013.
Mon Sep 30, 2013
Microhouse CEB floor today. Talking to Tudor Tarlev.
Sun Sep 29, 2013
Rototiller and Soil Pulverizer Development Board. Microhouse Build - pressing bricks - Soil Pulverizer at Work on the Microhouse. See Chris_Reinhart_Log#Sun_Eve.2C_Sep_29.2C_2013 for action.
Sat Sep 28, 2013
Microhouse build - rain so Microhouse Utility Module Build indoors, loft, door and window modules being worked. Fixing curl cylinder mounting on LifeTrac 6 - . Wrote Standard Collaboration Response for the Last Mile. Adding to design of LifeTrac_6_Hydraulics_-_Concept_Diagram.
Fri Sep 27, 2013
Planning meeting - Microhouse Build - shop organization, pressing bricks. Discussion with Ajay Jagtiani, IP Lawyer. Started LifeTrac 6 - Development Board.
Thu Sep 26, 2013
Kansas City Open Hardware Group. Hydraulics tool all day yesterday - plug and play 2 and 4 wheel drive, scalability to 3 and 4 power cubes. Getting LifeTrac 4 to bring brick press up to site while Lucas Log finishes hydraulics. Started CEB Press - Controller - Development Board. Cultural Revolution. Done Moving Brick Press 1 into Place 2013. 100km 1litro went open source!
Wed Sep 25, 2013
Concrete foundation pour today (Chris_Reinhart_Log#Wed_Sep_25.2C_2013) + mounting soil pulverizer on new tractor + pressing first bricks with new tractor and brick press. Getting Lucas to help. Jennifer Urban as potential board Member.
Tue Sep 24, 2013
Started Power Cube - Development Board. Ordered concrete for foundation pour - tomorrow.
Mon Sep 23, 2013
Gravel for foundation a rriving 9 AM. Putting in forms today, pouring tomorrow. Ground Rules of Social Entrepreneurship. Prepared Microhouse Foundation Forms. -
Sat Sep 20, 2013
Design Sprint from 9AM to 1PM. Critical Dev Path v9/21/13. Stepper Motor Controller - Module Diagram. Sketchup to Animation Protocol. Driving time from NYC to Maysville, Missouri - 18 hours 1 minute. Design Sprint and DPV Recruiting Plan. Microhouse Foundation and Piping Cross Section. CEB Press Development Board. Cheryl Dorsey - Echoing Green President - SEQ - Social Entrepreneurial Intelligence.
Fri Sep 20, 2013
Started Backhoe Side to Side Pivot Module. DPV Tracker.Microcombine Development Board. Use Coggle for Tech Tree of Choices. Microhouse Development Board. Critical Development Path v9/20/13. Chart, Diagram, and Flowchart Tools.
Thu Sep 19, 2013
LifeTrac 6 Modular Wheel Units - Assembly Procedure. LifeTrac 6 Hydraulics - Concept Diagram. Started LifeTrac 6 Hydraulics module page, linked to dozuki. Shuttleworth Discussion on Storytelling. Parkinson's Law of Trivialty. OSE Lasersaur dashboard started.
Wed Sep 18, 2013
Filled in LifeTrac 6 Modular Wheel Units Production Time Data. Started Operations - Site Maintenance. Started Operations - Budget Reporting. 3D File Diffs on Github. LifeTrac 6 Modular Wheel Units - Visual Bill of Materials. LifeTrac 6 Modular Wheel Units - Assembly.
Tue Sep 17, 2013
Started Purchases tracker. Continuing LifeTrac 6 Modular Wheel Units. Critical Path in Project Manager. Inventoried and secured remaining parts for Modular Wheel Units. Did total of 12 hours in the workshop including cutting/milling/drilling materials for Modular Wheel Units - see LifeTrac 6 Modular Wheel Units Production Time Data
Mon Sep 16, 2013
Continuing LifeTrac 6 Build Critical Path. Beginning on Lasersaur Build preparations. Started LifeTrac 6 Modular Wheel Units. Started Universal_Rotor_Commit_Log.
Sun Sep 15, 2013
Started LifeTrac 6 Build Checklist.
Sat Sep 14, 2013
Continuing Open Hardware Development Critical Path. Started LifeTrac Construction Set Video Script. Started Contributor Log. Updated Universal Rotor Construction Set. Tilting Suspension. Universal Mobility Construction Set. Open law from France - Sharelex. Cleared Microhouse Site - Chris_Reinhart_Log#Sat_Sep_14.2C_2013. Continuing Open Hardware Development Critical Path.
Fri Sep 13, 2013
LifeTrac 6 Deliverables Board. Katie's Bookmarks. Exploded Part Diagrams. Revamping Critical Path for Development. OSH Development Critical Path - Secondary. Open Hardware Development Critical Path. Continuing Development Protocols Needs. Water Line North.
Thu Sep 12, 2013
Graphical Tools Template. Getting ready to clear brush off construction site, source foundation materials, and ready the trencher Trencher Prototype 1 Video for its first real use after modification to new Universal Rotor. OSE Rapid Prototyping. See CAD File Formats from GrabCAD. Favorite Quotations.
Wed Sep 11, 2013
Submitted microhouse pitch to Shuttleworth. LifeTrac 6 Build Critical Path. LifeTrac 6 Deliverables Board. LifeTrac 6 Master Review Checklist. Photo to 3D. Katie's Bookmarks - Vendor Database, Operations Manual, Development Process, OSE Schedule, Staff Meeting, Routing, Material, RFQ, and Work Requisition.
Tue Sep 10, 2013
Updating Development Method Summary and discussed LifeTrac 6 Master Quality Control Checklist with Gary Log + Lucas Log + Dorkmo Log. Had Routine Executive Staff Meeting. Discussion with Karien on New Project Pitch. First Meeting with Catherine Austin Fitts. Founder Dating. Mass Rollout. Universal Rotor Construction Set. Phonebloks.
Mon Sep 9, 2013
Reviewing materials order, and working on Development Method Summary. Open Accelerator.
Mon Sep 9, 2013
Reviewing materials order, and working on Development Method Summary. Open Accelerator.
Thu Sep 5, 2013
At OHS 2013. Potential followthroughs on Lasersaur build, stepper controller finalization, 100km with 1 liter car, One Day Design Sprint - car as model for 4 days of design sprint from 0 to finalization with 0 entry barrier. Potential village pilot in Egypt. Potential keynote in Colombia. Alicia on board.
Wed Sep 4, 2013
Did Budget with Katie. Discussed goals until end of October with Catherine. Preparing for Open Hardware Summit. Docuementing CEB Press Pressure Switch Controller with James Log.
Tue Sep 3, 2013
Submitting OHS Presentation. Defining OSE License Requirements. Updating FAQ. Protocols in Progress. Development Process Graphic.
Mon Sep 2, 2013
OHS Presentation. Reviewing Master Product Development Board and reframing around deliverables in 2013 Development Template - Towards Completion.
Older Entries
- Marcin Log - September 2013 - LifeTrac 6 + Microhouse
- Marcin Log - August 2013 - LifeTrac 6 Prep.
- Marcin Log - July 2013 - LifeTrac 5 in NOLA
- Marcin Log - June 2013 - Sprinting
- Marcin Log - May 2013 - Rough Taste of Freedom
- Marcin Log - April 2013 - OSE 2.0 Beginning
- Marcin Log - March 2013 - End of Slumber
- Marcin Log - February 2013 - Operations Manager Recruiting
- Marcin Log - January 2013 - The Next Phase
- Marcin Log - December 2012 - Time for the Christmas Gift to the World
- Marcin Log - November 2012 - Stabilizing
- Marcin Log - October 2012 - Heating Up for Winter
- Marcin Log - September 2012 - Collaboratorium. Back to logging Sep. 13, 2012
- Marcin Log - August 2012 - chaos
- Marcin Log - July 2012 - exile
- Marcin Log - June 2012 - heat
- Marcin Log - May 2012
- Marcin Log - April 2012
- Marcin Log - March 2012
- Marcin Log - February 2012
- Marcin Log - January 2012
- Marcin Log - 2011
[2]