Industrial Robot/Manufacturing Instructions

From Open Source Ecology
Jump to: navigation, search


Industrial Robot
   Home  |  Research & Development  |  Bill of Materials  |  Manufacturing Instructions  |  User's Manual  |  User Reviews    Industrial Robot.png

Tooling and Infrastructure

Measuring and Marking

  • Scriber
  • Metal Rule
  • Combination Set
  • Center Punch

Taps and Dies

  • 1/2" - 13 Taps
  • 9/16" - 18 Taps
  • Tap Wrench

Port Cutting

  • SAE6 Port Contour Cutter

Drilling

  • Cordless Drill

Twist Drill Bits

  • 1/2"
  • 3/8"
  • 1/4"
  • 5/32"
  • 1/8"

Soldering

  • Soldering Iron and Stand
  • Solder

Torching

  • Oxy-acetylene Torch

Turning

  • Lathe
  • Cutting tools - turning, grooving

Hand Tools

  • Adjustable pliers
  • File

Fabrication

Foundation

  • The foundation can be a large tube that is flanged at both ends; one flange is fastened to the ground while the other is fastened to the axis 1 slewing bearing.
  • Alternatively, the foundation can be a plate that is fastened at its corners to the ground. On top of this ground-mounted plate, 4 upright pillars are welded or fastened; then, another plate is fastened upon these pillars then fastened again to the axis 1 slewing bearing.
  • Alternatively, the foundation can be two long square tubes that are fastened to the ground parallel and at a sizeable distance from each other. Then two more square tubes, parallel to each other but perpendicular to the first two tubes, are fastened on top of the first two tubes. Upright square bars are fastened to the intersections of the first and second tubes, making that 4 bars in total, being 1 to each intersection. A plate is fastened on top of these bars then fastened again to the axis 1 slewing bearing.

Base

  • The base can be comprised of an angle that partially fastens to the axis 1 slewing bearing and axis 2 slewing bearing. This angle also would allow mounting of the axis 1 hydraulic motor and axis 2 hydraulic motor, as well as the axis 1 encoder and the axis 2 encoder.
  • Alternatively, the base can be comprised of a plate that completely fastens to the axis 1 slewing bearing and another plate that completely fastens to the axis 2 slewing bearing. Then an angle fastens to the aforementioned 2 plates; this angle also would allow mounting of the axis 1 hydraulic motor and axis 2 hydraulic motor, as well as the axis 1 encoder and the axis 2 encoder.

Base-to-Mid

  • The base-to-mid can be comprised of a large bar that is partially fastened to the axis 2 slewing bearing and axis 3 slewing bearing.
  • Alternatively, the base-to-mid can be a plate that is completely fastened to the axis 2 slewing bearing and another plate that is completely fastened to the axis 3 slewing bearing. Then, these two plates would be fastened to the ends of a large bar.

Mid

  • Same as for "Base" except with the axis 3 and axis 4 slewing bearings, hydraulic motors, and encoders.

Mid-to-End

  • The mid-to-end can consist of a plate completely fastened to the axis 4 slewing bearing. The center of this plate can be welded to the end of a large square tube, the combination being perpendicular like a T. At the other end of the tube, a plate can be welded in parallel. This second plate would be completely fastened to the axis 5 slewing bearing.

End

Same as for "Base" except with the axis 5 and axis 6 slewing bearings, hydraulic motors, and encoders.

End-Effector

Stepper Mount

[6] Stepper Motor Mount Angle

    • Mark cuts with scriber and try-square
    • Cut with torch cutter
    • Mark holes with scriber, rule, try-square, and center punch
    • Drill holes with 1" bit, 1/4" bit, 1/8" bit, and cordless drill

Media:StepperMotorMountAngle.jpg

[6] Stepper Motor Mount Plate

    • Mark cuts with scriber and try-square
    • Cut with torch cutter
    • Mark holes with scriber, rule, try-square, and center punch
    • Drill holes with 1/4" bit and cordless drill

Media:StepperMotorMountPlate.jpg

[6] Shaft Coupling

    • Mark cuts with scriber and box-square
    • Cut with torch cutter
    • Mark thru hole with scriber, combination set, and center punch
    • Drill holes with 1/2" bit, 1/4" bit, 5/32" bit, and cordless drill
    • Tap holes with 10-24 taper/intermediate/plug taps and tap wrench

Media:ShaftBar.jpg

Assembly

Assemble Stepper Motor Mount

  • As shown below, repeat for a total of 6 mounts

Media:Stepneedlemount.jpg



The Global Village Construction Set
Habitat CEB Press Cement Mixer Sawmill Bulldozer Backhoe
Agriculture Tractor Seeder Hay Rake Well-Drilling Rig
Microtractor Soil Pulverizer Spader Hay Cutter Trencher
Bakery Oven Dairy Milker Microcombine Baler
Industry Multimachine Ironworker Laser Cutter Welder Plasma Cutter
CNC Torch Table Metal Roller Rod and Wire Mill Press Forge Universal Rotor
3D Printer 3D Scanner CNC Circuit Mill Industrial Robot Chipper Hammermill
Drill Press Induction Furnace
Energy Power Cube Gasifier Burner Solar Concentrator Electric Motor Generator Hydraulic Motor
Steam Engine Heat Exchanger Wind Turbine Pelletizer Universal Power Supply
Nickel-Iron Battery
Materials Aluminum Extractor Bioplastic Extruder
Transportation Car Truck

Imprimante 3D Scanner 3D Extracteur d'Aluminum Pelleteuse Four à Pain Presse à balles de paille Extrudeuse à bioplastiques Bulldozer Voiture Presse BTC Betonnière Broyeur à marteaux Imprimante de circuits électroniques Table de découpe numérique Trayeuse Perçeuse à colonne Moteur électrique Gazogène Faucheuse Râteau à foin Moteur hydraulique Fourneau à induction Bras robotisé Poinçonneuse Découpeur Laser Laminoir à plaques Microcombine Microtracteur Multimachine Batterie Ni-Fe Machine à granulés Torche plasma Power Cube Presse hydraulique Laminoir à barres et fils de fer Pulvérisateur de terre Scierie Semoir Concentrateur solaire Roto-bêche Moteur à vapeur Echangeur de chaleur Tracteur Fraiseuse de tranchée Camion Alimentation électrique universelle Rotor universel Poste de soudure à l'arc Plateforme de forage de puits Eolienne

Key Design Planning Prototype Almost done Full Release