Marcin Log: Difference between revisions
Line 7: | Line 7: | ||
</html> | </html> | ||
=Wed Aug 14, 2013= | =Wed Aug 14, 2013= | ||
[[LifeTrac Cab Module Requirements]]. | [[LifeTrac Cab Module Requirements]]. Reworking [[Future State July 2013]] to start Real Development Board, and integrating with [[Dozuki]] template. | ||
=Mon Aug 12, 2013= | =Mon Aug 12, 2013= |
Revision as of 22:43, 14 August 2013
see Work Log for howto.
Wed Aug 14, 2013
LifeTrac Cab Module Requirements. Reworking Future State July 2013 to start Real Development Board, and integrating with Dozuki template.
Mon Aug 12, 2013
OSE Development Method Planning. LifeTrac 6 Design Rules. GrabCAD Protocol. Recording 6 in 60 Report Script. Scripting HydraFabber Blog Post. LifeTrac 5 Data Collection. LifeTrac 6 Product Development Board. 45.6 Cu In Hydraulic Motor. Started Shop Inventory Standards. Published editable Workshop Map Template. On the Open IP climate in DC - Sparkfun Testifies in Front of US Judiciary. Started LifeTrac 6 Parts Order. How a Bolt is Made. Updated BOM Template for metal and bolt weights includeig calculators.
Sun Aug 11, 2013
Rural Water Connection. Understanding the Economy.
Sat Aug 10, 2013
Design Sprint - Development_Status_and_Needs#Sat_Aug_10.2C_2013_Plan. Puttting in remaining Modules#GVCS_Modules_Spreadsheet into Dozuki. OSE Documentation Wireframe. LifeTrac 5 Field Testing. LifeTrac 6 Review. LifeTrac 6 GrabCAD Challenge - according to GrabCAD Challenge Template. 10W Laser Cutter Calculations from Tim - 200mm second = .5 mph. Collaboration Architecture for 1 Day Design-Build Event. 10W Laser Cutter Concept Diagram.
Thu Aug 8, 2013
Updated process part of OSE_Specifications_for_Product_Design. Dev template clarity discussion with Katie. Found about Solidoodle-printed car - Solidoodle Car. Refining the Flashy XM Control Panel development process to current process based on 6 in 60 and LifeTrac 5 experiences with Module-Based design to yield August 2013 Development Template. Design Sprint CRM Platform. OSE Utilities Map.
Wed Aug 7, 2013
CEB Press Genealogy. InterLace - commons-based peer production with video. Google Drawing Template. ZoomRP. Initial microhouse concept discussion with Chris - Chris_Reinhart_Log#Concept_drawing_thoughts. Updated Blogging Standards for technical blog posts such as invited to Tim Log for 10W laser cutter. Going over Project Manager Tutorials. Rob is looking for Google_Hangout_Alternative. Limit in hangout is 10 or 15 peeps. First use of Contractor IP Agreement with Independent Contractor Template. James got CEB Controller schematic in Upverter, and began BOM - James_Slade_Log#Thu_Aug_8.2C_2013. Second True Fans Hangout invite.
Tue Aug 6, 2013
Beginning LifeTrac 6 design and development. Team Microhouse Discussion.
Sun Aug 4, 2013
Sat Aug 3, 2013
Design Sprint - Development_Status_and_Needs#Sat_Aug_3.2C_2013_Plan. Torch Height Controller ready for build - Paul Log. 270 modules put up on Dozuki. Open Source Power Electronics Construction Set Diagram. Need to start CEB Press 6 Development Matrix.
Fri Aug 2, 2013
Critical Path Template. Embedded GVCS Comparison to Industry Standards. Updated OSE Specifications for Product Design.
Thu Aug 1, 2013
Microhouse Build Planning. Open Source License Compliance Audit for software in manufacturing. Refined to Development Template 2.
Older Entries
- Marcin Log - July 2013 - LifeTrac 5 in NOLA
- Marcin Log - June 2013 - Sprinting
- Marcin Log - May 2013 - Rough Taste of Freedom
- Marcin Log - April 2013 - OSE 2.0 Beginning
- Marcin Log - March 2013 - End of Slumber
- Marcin Log - February 2013 - Operations Manager Recruiting
- Marcin Log - January 2013 - The Next Phase
- Marcin Log - December 2012 - Time for the Christmas Gift to the World
- Marcin Log - November 2012 - Stabilizing
- Marcin Log - October 2012 - Heating Up for Winter
- Marcin Log - September 2012 - Collaboratorium. Back to logging Sep. 13, 2012
- Marcin Log - August 2012 - chaos
- Marcin Log - July 2012 - exile
- Marcin Log - June 2012 - heat
- Marcin Log - May 2012
- Marcin Log - April 2012
- Marcin Log - March 2012
- Marcin Log - February 2012
- Marcin Log - January 2012
- Marcin Log - 2011
[2]