CEB Press/Bill of Materials: Difference between revisions
James Slade (talk | contribs) |
|||
Line 26: | Line 26: | ||
===Hydraulics=== | ===Hydraulics=== | ||
<html><iframe width='800' height='300' frameborder='0' src='https://spreadsheets.google.com/spreadsheet/pub?hl=en_US&hl=en_US&key=0AmZOu2AF-TF5dGViSHV0b2JMX29ibE9OMkJfNnBtc1E&single=true&gid=0&range=A1% | <html><iframe width='800' height='300' frameborder='0' src='https://spreadsheets.google.com/spreadsheet/pub?hl=en_US&hl=en_US&key=0AmZOu2AF-TF5dGViSHV0b2JMX29ibE9OMkJfNnBtc1E&single=true&gid=0&range=A1%3AC46&output=html&widget=true'></iframe> | ||
</html> | </html> | ||
Revision as of 20:04, 17 October 2011
CEB Press | ||
---|---|---|
Home | Research & Development | Bill of Materials | Manufacturing Instructions | User's Manual | User Reviews | ![]() |
Official CEB Press Bill of Materials
This is the first official release of a complete Bill of Materials for the OSE CEB Press - The Liberator. Last updated July 20, 2011.
Warning: The documentation for the CEB Press is undergoing a thorough overhaul. CAD models and written directions are presently obsolete. For more information, see Talk:CEB_Press#Documentation_overhaul_in_progress. When the models, specifications and text on this article have been thoroughly reviewed, updated when necessary, and confirmed as whole and accurate, this warning may be removed. The Bill of Materials will likely only be accurate when all parts manufacturing instructions are verified as correct (specs for materials have changed).
Frame Metal
To be sourced from any metal shop.
(You can save a copy of this Bill of Materials from the original Google spreadsheet or Open Document Format)
Note: the Open Document Format document contains several sheets. The sheets contain formulas. The Cleaned Breakdown List is a part-by-part breakdown of the machine by assembly. The Order Sheet is what you fax to your metal shop to make the metal order. Any component changed on the Breakdown List will automatically be tallied on the Order Sheet.
Steel Order Sheet - Regular CEB Press
Steel Order Sheet - 'Super' CEB Press - Makes Larger Bricks
Note: eliminate 1/4"x2"x3" angle and replace with 1/4"x2"x2" - [2] 20-3/4" and [2] 5-1/2" for a total of 52-1/2"
Hydraulics
Electronics
Electronic Components necessary to complete Arduino Breakout board:
Quantity | Part Number | Description | Unit Price | Distributor |
8 | 277-1251-ND | CONN TERM BLOCK 6POS 5.08MM PCB | 2.12 | digikey.com |
1 | ED7150-ND | SIP SOCKET 50 POS STRAIGHT PCB | 7.62 | digikey.com |
1 | ED7264-ND | SIP HEADER 64 POS STRAIGHT PCB | 8.85 | digikey.com |
1 | P100BACT-ND | RES 100 OHM CARBON FILM 1/4W 5% | 0.09 | digikey.com |
1 | 160-1702-ND | LED 5MM GREEN TRANSPARENT | 0.38 | digikey.com |
1 | 7914G-000EDKR-ND* | SWITCH TACT 4MM SQ SMD GULL WING | 1.54 | digikey.com |
- * This is a SMD switch, should order a "through hole" switch instead - I didn't see the part on the DigiKey website, though. - Tom
Fasteners
Tools and Supplies
Previous Work
- CEB Bill of Materials (June 2011)
- CEB Modeling (July 2008)
- CEB Press 2 (April 2009)
- Bill of materials for The Liberator II (Nov 2009). This appears to be the 'manual version'
- Calculated Bill of Materials for The Liberator Beta v1.0 (Nov 2009)
- CEB Fabrication (Feb 2010)
- The Liberator Packing List (June 2010)
- FeF Liberator Fabrication
- Full Produce Release - Parts Costs - (June 2010)
- Full Product Release - The Liberator, Manual Version (June 2010)
- The Liberator BOM (June 2010)
- The Liberator Master Bill of Materials (Aug 2010)
- CEB Prototype 1 Fab (Nov 2010)