CEB Press/Manufacturing Instructions: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
 
(181 intermediate revisions by 12 users not shown)
Line 1: Line 1:
{{Category=CEB press}}
{{GVCS Header}}
=Overview=


{{ToolTemplate|ToolName=CEB Press}}
This page gives you all the information you need to make your CEB Press from stock steel and parts. The steps in '''Mechanical Fabrication''' and '''Electronic Components''' are independent of each other, but within each category, the suggested order should be followed. Once you finish both, you can continue on to '''Final Machine Integration'''. At that point, your machine can be used.


'''This page will hold the final version of the Build Instructions after the wiki reorganization. This is a list of pages that might hold relevant info. These need to be consolidated here:''' --[[User:Conor|Conor]] 10:00, 20 February 2011 (PST)
'''The entire fabrication procedure is contained in a master PDF file - [[Media:CEB_a-z_Build_1.0.pdf|CEB A-Z Fabrication Instructions 2011]]'''


*[[CEB Fabrication]]
=Prototype IV Fabrication=
*[[CEB Automation Prototype II]]
==Drawer==
*[[Arduino Control of CEB Prototype 2]]
See Fabrication Diagram and Master Index for part numbers
*[[FeF Liberator Fabrication]]
*[[Grate Shaker]]
*[[CEB Press 2]]
*[[CEB Automation Prototype II]]
*[[The Liberator Assembly]]
*[[The Liberator Full Release - Mechanical Fabrication]]
*[http://openpario.mime.oregonstate.edu/documents/94 dxf files]
*[http://openpario.mime.oregonstate.edu/projects/oseceb]
*[[The_Liberator_Beta_v1.0_Specifications]]
*[[Bill_of_materials_for_The_Liberator_II]]
*[http://openpario.mime.oregonstate.edu/documents/104 pdfs]
*[[Calculated_Bill_of_Materials_for_The_Liberator_Beta_v1.0]]
*[[The_Liberator_Master_Bill_of_Materials]]
*http://vimeo.com/22102016


#Tack two sets of 70 and 71 together
##Instead of 5/8" thickness for 70, use 1/2" thickness on one rail
##Tack so that 5/8" can be replaced with 1/2" if needed
##Grind tacks off top
##QC - work on a flat surface, so top side is within 1/64" inch even for both rails
##QC - tacks ground down to surface of rails as can be felt with a flat surface


----
=Tools and Materials for Prototype III=


From this page you will find information on how to build the different models of Compressed Earth Brick (CEB) press machines that the Open Source Ecology group have designed.
*'''Spreadsheet'''


<html><iframe width='800' height='500' frameborder='0' src='


https://docs.google.com/spreadsheet/pub?hl=en_US&hl=en_US&key=0AlpsBarfpPkzdHF1TmxZQnVTU1dxbGF1a0V3MmZfcUE&output=html


==Part Fabrication Guides ==
'></iframe>
</html>


#[[CEB Press Build Instructions/Arms - primary|Arms - primary]]
*'''Edit'''
#[[CEB Press Build Instructions/Arms - secondary|Arms - secondary]]
#[[CEB Press Build Instructions/Feet|Feet]]
#[[CEB Press Build Instructions/Frame with main cylinder|Frame with main cylinder]]
#[[CEB Press Build Instructions/Grate mounts|Grate mounts]]
#[[CEB Press Build Instructions/Hopper sheet metal|Hopper sheet metal]]
#[[CEB Press Build Instructions/Hopper mounting plate|Hopper mounting plate]]
#[[CEB Press Build Instructions/Hopper supports|Hopper supports]]
#[[CEB Press Build Instructions/Hoses - Secondary cylinder hose unit|Hoses - Secondary cylinder hose unit]]
#[[CEB Press Build Instructions/Hoses - Shaker and main cylinder|Hoses - Shaker and main cylinder]]
#[[CEB Press Build Instructions/Hoses - Main hose unit|Hoses - Main hose unit]]
#[[CEB Press Build Instructions/Legs|Legs]]
#[[CEB Press Build Instructions/Roller guides|Roller guides]]
#[[CEB Press Build Instructions/Secondary cylinder|Secondary cylinder]]
#[[CEB Press Build Instructions/Secondary cylinder sensor unit|Secondary cylinder sensor unit]]
#[[CEB Press Build Instructions/Sensor - Main cylinder|Sensor - Main cylinder]]
#[[CEB Press Build Instructions/Sensor - Secondary cylinder|Sensor - Secondary cylinder]]
#[[CEB Press Build Instructions/Sensor - Soil|Sensor - Soil]]
#[[CEB Press Build Instructions/Soil grate|Soil grate]]
#[[CEB Press Build Instructions/Soil loading drawer|Soil loading drawer]]
#[[CEB Press Build Instructions/Soil Shaker motor unit|Soil Shaker motor unit]]
#[[CEB Press Build Instructions/Soil Shaker|Soil Shaker]]


https://docs.google.com/spreadsheet/ccc?key=0AlpsBarfpPkzdHF1TmxZQnVTU1dxbGF1a0V3MmZfcUE


'''Manual'''
=Mechanical Fabrication=
The purpose of this section is to build and assemble all mechanical components of the CEB. You must first cut the steel, then fabricate individual parts, then assemble them, and then paint the machine.
==Steel Cut List==
*Cut the steel into the following lengths.
*Label and separate cuts by "Step" number so you can easily find cuts for each step during the fabrication stage.
*Note: Item Number and part number refer to CAD information. This is un-necessary if you are following the fabrication steps listed.
*Also, from the sheet, torch the [[media:hoppersheet2.png|Hopper Sheet Metal]] and the [[media:platestorch.png|simple plates]].
<html><iframe width='750' height='300' frameborder='0' src='https://docs.google.com/spreadsheet/pub?hl=en_US&hl=en_US&key=0AtAVl-K5-trVdFQ3MHJBZ2h0dFlqcjBib1NnZ25CZGc&output=html'></iframe>
</html><br/>
[https://docs.google.com/spreadsheet/pub?hl=en_US&hl=en_US&key=0AtAVl-K5-trVdFQ3MHJBZ2h0dFlqcjBib1NnZ25CZGc&output=html Link] to printable page.


*[[CEB Press Build Instructions/Hydraulic control valve|Hydraulic control valve]]
==Parts Fabrication==
The purpose of this section is to assemble the cut steel into individual parts and assemblies.
*Please see [https://docs.google.com/spreadsheet/pub?hl=en_US&hl=en_US&key=0AtAVl-K5-trVdFdoblptQ2ZlUlBrQ3RHVHk5b1Rmd0E&output=html this spreadsheet] for what steel each step requires.


'''Automatic'''
===Structural Components===
#[http://makeprojects.com/Project/Simple-Plates/1719/1 Simple Plates]  <-link broken ?
#[http://makeprojects.com/Project/CEB-Support-System/1718/1 Frame structural support components]


*[[CEB Press Build Instructions/Controller box and cord|Controller box and cord]]
===Shaker===
*[[CEB Press Build Instructions/Solenoid valve|Solenoid valve]]
<ol><li value="3">[http://makeprojects.com/Project/CEB-Shaker-Mount/1717/1 Shaker Mount]
*[[CEB Press Build Instructions/Detroit Fab Lab Solenoid Driver]]
<li>[http://makeprojects.com/Project/CEB-Shaker-Hammer-and-Shaft/1725/1 Shaker Hammer and Shaft]
<li>[http://makeprojects.com/Project/CEB-Shaker-Hydraulics-Assembly/1750/1 Shaker Hydraulics]</ol>


===Hopper and Grate===
<ol><li value="6">[http://makeprojects.com/Project/CEB-Hopper-Supports-and-Grate-Supports/1722/1 Hopper and Grate Supports]
<li>[http://makeprojects.com/Project/Prepare-the-Hopper-Sheet-Metal/1723/1 Hopper Sheet Metal]
<li>[http://makeprojects.com/Project/Hopper-Mounting-Plate/1732/1 Hopper Mounting plate] <-link broken ?
<li>[http://makeprojects.com/Project/CEB-Soil-Grate/1731/1 Grate]</ol>


[[The Liberator Assembly | Final Assembly and Job Site Setup]]
===Machine Core===
<ol><li value="10">[http://makeprojects.com/Project/Soil-Loading-Drawer/1724/1 Soil Loading Drawer]
<li>[http://makeprojects.com/Project/Roller-Guides/1730/1 Roller Guides]</ol><-link 11 broken ?


[[CEB Press Testing and Troubleshooting]]
===Main Frame Preparation===
<ol><li value="12">[http://makeprojects.com/Project/CEB-Wide-Cylinder-Supports/1735/1 Wide Cylinder Supports]
<li>[http://makeprojects.com/Project/CEB-Main-Frame-Small-components/1736/1 Main Frame Small Components]
<li>[http://makeprojects.com/Project/CEB-Main-Frame-U-Channel-Prep/1737/1 Main Frame U-Channel Prep]-Still needs fab drawings</ol>
<ol><li value="15">[http://makeprojects.com/Project/CEB-Press-Feet/1738/1 Make the Press Feet] <-link broken?
<li>[http://makeprojects.com/Project/CEB-Main-Cylinder-Prep/1739/1 Prepare the main cylinder]</ol>


==Firmware==
===Main Frame Assembly===
Source code can be found at github: https://github.com/OSE/ceb-controller
<ol><li value="17">[http://makeprojects.com/Project/CEB-Main-Frame-Assemble-U-Channel/1740/1 Assemble U Channel]
<li>[http://makeprojects.com/Project/Fitting-the-Main-Cylinder/1414/1 Fit the Main Cylinder]
<li>[http://makeprojects.com/Project/CEB-Stretching-the-frame/1742/1 Stretch the frame]
<li>[http://makeprojects.com/Project/CEB-Frame-install-smaller-components-and-weld-spacers/1744/1 Weld the spacers]
<li>[http://makeprojects.com/Project/CEB-Main-frame-Install-Small-Components/1745/1 Install Small Components]
<li>[http://makeprojects.com/Project/CEB-Fit-the-Drawer-members/1746/1 Fit the Drawer Members]</ol>
===Hydraulics===
*[[CEB Press/Manufacturing Instructions/Hoses - Secondary cylinder hose unit|Hoses - Secondary cylinder hose unit]]


Old code:
==Parts Assembly==
*[[CEB Control Source Code v1.01 Annotated]]
The purpose of this section is to assemble all of the parts you made in the '''parts fabrication''' section.
*[[CEB Control Source Code v1.01]]
#[http://makeprojects.com/Project/Structural-Components/1437/1 Assemble the structural components]
*[[CEB Control Source Code v1.0]]
#[http://makeprojects.com/Project/CEB-Press-Prototype-III-Assembly-Soil-loading-system/1471/1 Assemble the Soil Loading System]
#[http://makeprojects.com/Project/CEB-Shaker-Assembly/1728/1 Shaker Assembly]
#[http://makeprojects.com/Project/CEB-Press-Prototype-III-Assembly-Adjusting-the-drawer/1447/1 Adjust the Drawer]
#[http://makeprojects.com/Project/CEB-Press-Prototype-III-Assembly-Installing-the-secondary-cylinder/1489/1 Install the secondary cylinder]
#[http://makeprojects.com/Project/Hard-lining-the-main-cylinder/1490/1 Hard-line the main cylinder]


*[http://openpario.mime.oregonstate.edu/documents/537 Control Code Site]
==Paint==
# Cover the hydraulics and any other place that should not be painted.
# Check all external surfaces for sharp edges and smooth with angle grinder.
# Remove any surface rust with wire brush and / or sandpaper.
# Apply a thorough coating of paint to all steel surfaces.
# Allow 24 hours to dry before handling.


=Electronic Components Assembly=


[[Category:CEB Press Fabrication]]
#[[CEB Press/Manufacturing Instructions/Linked Extension Cord|Linked Extension Cord]]
#[[CEB Press/Manufacturing Instructions/Sensor Unit|Sensor Unit]]
#[[CEB Press/Manufacturing Instructions/Case|Case]]
#[[CEB_Press/Manufacturing_Instructions/Detroit_Fab_Lab_Solenoid_Driver_v2|Solenoid Driver v2]]
#[[CEB Press/Manufacturing Instructions/Controller Box|Controller Box]]
 
=Final Machine Integration=
#[[CEB Press/Manufacturing Instructions/Mount Solenoid Valve Set And Controller Box|Mount Solenoid Valve Set, Controller Box and Sensors]]
#[[CEB Press/Manufacturing Instructions/ElectrohydraulicIntegration|Electrohydraulic Integration]]
#[[CEB_Press_Control_Code|CEB Press Control Code]]
 
{{GVCS Footer}}
{{Civilization_Starter_Kit_DVD}}

Latest revision as of 00:15, 20 July 2014


CEB Press
   Home  |  Research & Development  |  Bill of Materials  |  Manufacturing Instructions  |  User's Manual  |  User Reviews    CEB Press.png

Overview

This page gives you all the information you need to make your CEB Press from stock steel and parts. The steps in Mechanical Fabrication and Electronic Components are independent of each other, but within each category, the suggested order should be followed. Once you finish both, you can continue on to Final Machine Integration. At that point, your machine can be used.

The entire fabrication procedure is contained in a master PDF file - CEB A-Z Fabrication Instructions 2011

Prototype IV Fabrication

Drawer

See Fabrication Diagram and Master Index for part numbers

  1. Tack two sets of 70 and 71 together
    1. Instead of 5/8" thickness for 70, use 1/2" thickness on one rail
    2. Tack so that 5/8" can be replaced with 1/2" if needed
    3. Grind tacks off top
    4. QC - work on a flat surface, so top side is within 1/64" inch even for both rails
    5. QC - tacks ground down to surface of rails as can be felt with a flat surface

Tools and Materials for Prototype III

  • Spreadsheet

  • Edit

https://docs.google.com/spreadsheet/ccc?key=0AlpsBarfpPkzdHF1TmxZQnVTU1dxbGF1a0V3MmZfcUE

Mechanical Fabrication

The purpose of this section is to build and assemble all mechanical components of the CEB. You must first cut the steel, then fabricate individual parts, then assemble them, and then paint the machine.

Steel Cut List

  • Cut the steel into the following lengths.
  • Label and separate cuts by "Step" number so you can easily find cuts for each step during the fabrication stage.
  • Note: Item Number and part number refer to CAD information. This is un-necessary if you are following the fabrication steps listed.
  • Also, from the sheet, torch the Hopper Sheet Metal and the simple plates.


Link to printable page.

Parts Fabrication

The purpose of this section is to assemble the cut steel into individual parts and assemblies.

Structural Components

  1. Simple Plates <-link broken ?
  2. Frame structural support components

Shaker

  1. Shaker Mount
  2. Shaker Hammer and Shaft
  3. Shaker Hydraulics

Hopper and Grate

  1. Hopper and Grate Supports
  2. Hopper Sheet Metal
  3. Hopper Mounting plate <-link broken ?
  4. Grate

Machine Core

  1. Soil Loading Drawer
  2. Roller Guides

<-link 11 broken ?

Main Frame Preparation

  1. Wide Cylinder Supports
  2. Main Frame Small Components
  3. Main Frame U-Channel Prep-Still needs fab drawings
  1. Make the Press Feet <-link broken?
  2. Prepare the main cylinder

Main Frame Assembly

  1. Assemble U Channel
  2. Fit the Main Cylinder
  3. Stretch the frame
  4. Weld the spacers
  5. Install Small Components
  6. Fit the Drawer Members

Hydraulics

Parts Assembly

The purpose of this section is to assemble all of the parts you made in the parts fabrication section.

  1. Assemble the structural components
  2. Assemble the Soil Loading System
  3. Shaker Assembly
  4. Adjust the Drawer
  5. Install the secondary cylinder
  6. Hard-line the main cylinder

Paint

  1. Cover the hydraulics and any other place that should not be painted.
  2. Check all external surfaces for sharp edges and smooth with angle grinder.
  3. Remove any surface rust with wire brush and / or sandpaper.
  4. Apply a thorough coating of paint to all steel surfaces.
  5. Allow 24 hours to dry before handling.

Electronic Components Assembly

  1. Linked Extension Cord
  2. Sensor Unit
  3. Case
  4. Solenoid Driver v2
  5. Controller Box

Final Machine Integration

  1. Mount Solenoid Valve Set, Controller Box and Sensors
  2. Electrohydraulic Integration
  3. CEB Press Control Code


The Global Village Construction Set
Habitat CEB Press Cement Mixer Sawmill Bulldozer Backhoe
Agriculture Tractor Seeder Hay Rake Well-Drilling Rig
Microtractor Soil Pulverizer Spader Hay Cutter Trencher
Bakery Oven Dairy Milker Microcombine Baler
Industry Multimachine Ironworker Laser Cutter Welder Plasma Cutter
CNC Torch Table Metal Roller Rod and Wire Mill Press Forge Universal Rotor
3D Printer 3D Scanner CNC Circuit Mill Industrial Robot Chipper Hammermill
Drill Press Induction Furnace
Energy Power Cube Gasifier Burner Solar Concentrator Electric Motor Generator Hydraulic Motor
Steam Engine Heat Exchanger Wind Turbine Pelletizer Universal Power Supply
Nickel-Iron Battery
Materials Aluminum Extractor Bioplastic Extruder
Transportation Car Truck

Imprimante 3D Scanner 3D Extracteur d'Aluminum Pelleteuse Four à Pain Presse à balles de paille Extrudeuse à bioplastiques Bulldozer Voiture Presse BTC Betonnière Broyeur à marteaux Imprimante de circuits électroniques Table de découpe numérique Trayeuse Perçeuse à colonne Moteur électrique Gazogène Faucheuse Râteau à foin Moteur hydraulique Fourneau à induction Bras robotisé Poinçonneuse Découpeur Laser Laminoir à plaques Microcombine Microtracteur Multimachine Batterie Ni-Fe Machine à granulés Torche plasma Power Cube Presse hydraulique Laminoir à barres et fils de fer Pulvérisateur de terre Scierie Semoir Concentrateur solaire Roto-bêche Moteur à vapeur Echangeur de chaleur Tracteur Fraiseuse de tranchée Camion Alimentation électrique universelle Rotor universel Poste de soudure à l'arc Plateforme de forage de puits Eolienne

Key Design Planning Prototype Almost done Full Release

Back to Table of Contents