CEB Press/Manufacturing Instructions: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
 
(13 intermediate revisions by 5 users not shown)
Line 6: Line 6:
'''The entire fabrication procedure is contained in a master PDF file - [[Media:CEB_a-z_Build_1.0.pdf|CEB A-Z Fabrication Instructions 2011]]'''
'''The entire fabrication procedure is contained in a master PDF file - [[Media:CEB_a-z_Build_1.0.pdf|CEB A-Z Fabrication Instructions 2011]]'''


=Tools and Materials=
=Prototype IV Fabrication=
==Drawer==
See Fabrication Diagram and Master Index for part numbers
 
#Tack two sets of 70 and 71 together
##Instead of 5/8" thickness for 70, use 1/2" thickness on one rail
##Tack so that 5/8" can be replaced with 1/2" if needed
##Grind tacks off top
##QC - work on a flat surface, so top side is within 1/64" inch even for both rails
##QC - tacks ground down to surface of rails as can be felt with a flat surface
 
=Tools and Materials for Prototype III=


*'''Spreadsheet'''
*'''Spreadsheet'''
Line 20: Line 31:


https://docs.google.com/spreadsheet/ccc?key=0AlpsBarfpPkzdHF1TmxZQnVTU1dxbGF1a0V3MmZfcUE
https://docs.google.com/spreadsheet/ccc?key=0AlpsBarfpPkzdHF1TmxZQnVTU1dxbGF1a0V3MmZfcUE


=Mechanical Fabrication=
=Mechanical Fabrication=
Line 38: Line 48:


===Structural Components===
===Structural Components===
#[http://makeprojects.com/Project/Simple-Plates/1719/1 Simple Plates]
#[http://makeprojects.com/Project/Simple-Plates/1719/1 Simple Plates] <-link broken ?
#[http://makeprojects.com/Project/CEB-Support-System/1718/1 Frame structural support components]
#[http://makeprojects.com/Project/CEB-Support-System/1718/1 Frame structural support components]


Line 49: Line 59:
<ol><li value="6">[http://makeprojects.com/Project/CEB-Hopper-Supports-and-Grate-Supports/1722/1 Hopper and Grate Supports]
<ol><li value="6">[http://makeprojects.com/Project/CEB-Hopper-Supports-and-Grate-Supports/1722/1 Hopper and Grate Supports]
<li>[http://makeprojects.com/Project/Prepare-the-Hopper-Sheet-Metal/1723/1 Hopper Sheet Metal]
<li>[http://makeprojects.com/Project/Prepare-the-Hopper-Sheet-Metal/1723/1 Hopper Sheet Metal]
<li>[http://makeprojects.com/Project/Hopper-Mounting-Plate/1732/1 Hopper Mounting plate]
<li>[http://makeprojects.com/Project/Hopper-Mounting-Plate/1732/1 Hopper Mounting plate] <-link broken ?
<li>[http://makeprojects.com/Project/CEB-Soil-Grate/1731/1 Grate]</ol>
<li>[http://makeprojects.com/Project/CEB-Soil-Grate/1731/1 Grate]</ol>


===Machine Core===
===Machine Core===
<ol><li value="10">[http://makeprojects.com/Project/Soil-Loading-Drawer/1724/1 Soil Loading Drawer]
<ol><li value="10">[http://makeprojects.com/Project/Soil-Loading-Drawer/1724/1 Soil Loading Drawer]
<li>[http://makeprojects.com/Project/Roller-Guides/1730/1 Roller Guides]</ol>
<li>[http://makeprojects.com/Project/Roller-Guides/1730/1 Roller Guides]</ol><-link 11 broken ?


===Main Frame Preparation===
===Main Frame Preparation===
Line 60: Line 70:
<li>[http://makeprojects.com/Project/CEB-Main-Frame-Small-components/1736/1 Main Frame Small Components]
<li>[http://makeprojects.com/Project/CEB-Main-Frame-Small-components/1736/1 Main Frame Small Components]
<li>[http://makeprojects.com/Project/CEB-Main-Frame-U-Channel-Prep/1737/1 Main Frame U-Channel Prep]-Still needs fab drawings</ol>
<li>[http://makeprojects.com/Project/CEB-Main-Frame-U-Channel-Prep/1737/1 Main Frame U-Channel Prep]-Still needs fab drawings</ol>
<ol><li value="15">[http://makeprojects.com/Project/CEB-Press-Feet/1738/1 Make the Press Feet]
<ol><li value="15">[http://makeprojects.com/Project/CEB-Press-Feet/1738/1 Make the Press Feet] <-link broken?
<li>[http://makeprojects.com/Project/CEB-Main-Cylinder-Prep/1739/1 Prepare the main cylinder]</ol>
<li>[http://makeprojects.com/Project/CEB-Main-Cylinder-Prep/1739/1 Prepare the main cylinder]</ol>


Line 94: Line 104:
#[[CEB Press/Manufacturing Instructions/Sensor Unit|Sensor Unit]]
#[[CEB Press/Manufacturing Instructions/Sensor Unit|Sensor Unit]]
#[[CEB Press/Manufacturing Instructions/Case|Case]]
#[[CEB Press/Manufacturing Instructions/Case|Case]]
#[http://opensourceecology.org/wiki/CEB_Press/Manufacturing_Instructions/Detroit_Fab_Lab_Solenoid_Driver_v2 Solenoid Driver v2]
#[[CEB_Press/Manufacturing_Instructions/Detroit_Fab_Lab_Solenoid_Driver_v2|Solenoid Driver v2]]
#[[CEB Press/Manufacturing Instructions/Controller Box|Controller Box]]
#[[CEB Press/Manufacturing Instructions/Controller Box|Controller Box]]


=Final Machine Integration=
=Final Machine Integration=
#[[CEB Press/Manufacturing Instructions/Mount Solenoid Valve Set And Controller Box|Mount Solenoid Valve Set And Controller Box ]]  
#[[CEB Press/Manufacturing Instructions/Mount Solenoid Valve Set And Controller Box|Mount Solenoid Valve Set, Controller Box and Sensors]]  
#[[CEB Press/Manufacturing Instructions/ElectrohydraulicIntegration|Electrohydraulic Integration]]
#[[CEB Press/Manufacturing Instructions/ElectrohydraulicIntegration|Electrohydraulic Integration]]
#[[CEB Press/Manufacturing Instructions/Code Upload|Code Upload]]
#[[CEB_Press_Control_Code|CEB Press Control Code]]
 
 
 
 
 
 


{{GVCS Footer}}
{{GVCS Footer}}
{{Civilization_Starter_Kit_DVD}}

Latest revision as of 00:15, 20 July 2014


CEB Press
   Home  |  Research & Development  |  Bill of Materials  |  Manufacturing Instructions  |  User's Manual  |  User Reviews    CEB Press.png

Overview

This page gives you all the information you need to make your CEB Press from stock steel and parts. The steps in Mechanical Fabrication and Electronic Components are independent of each other, but within each category, the suggested order should be followed. Once you finish both, you can continue on to Final Machine Integration. At that point, your machine can be used.

The entire fabrication procedure is contained in a master PDF file - CEB A-Z Fabrication Instructions 2011

Prototype IV Fabrication

Drawer

See Fabrication Diagram and Master Index for part numbers

  1. Tack two sets of 70 and 71 together
    1. Instead of 5/8" thickness for 70, use 1/2" thickness on one rail
    2. Tack so that 5/8" can be replaced with 1/2" if needed
    3. Grind tacks off top
    4. QC - work on a flat surface, so top side is within 1/64" inch even for both rails
    5. QC - tacks ground down to surface of rails as can be felt with a flat surface

Tools and Materials for Prototype III

  • Spreadsheet

  • Edit

https://docs.google.com/spreadsheet/ccc?key=0AlpsBarfpPkzdHF1TmxZQnVTU1dxbGF1a0V3MmZfcUE

Mechanical Fabrication

The purpose of this section is to build and assemble all mechanical components of the CEB. You must first cut the steel, then fabricate individual parts, then assemble them, and then paint the machine.

Steel Cut List

  • Cut the steel into the following lengths.
  • Label and separate cuts by "Step" number so you can easily find cuts for each step during the fabrication stage.
  • Note: Item Number and part number refer to CAD information. This is un-necessary if you are following the fabrication steps listed.
  • Also, from the sheet, torch the Hopper Sheet Metal and the simple plates.


Link to printable page.

Parts Fabrication

The purpose of this section is to assemble the cut steel into individual parts and assemblies.

Structural Components

  1. Simple Plates <-link broken ?
  2. Frame structural support components

Shaker

  1. Shaker Mount
  2. Shaker Hammer and Shaft
  3. Shaker Hydraulics

Hopper and Grate

  1. Hopper and Grate Supports
  2. Hopper Sheet Metal
  3. Hopper Mounting plate <-link broken ?
  4. Grate

Machine Core

  1. Soil Loading Drawer
  2. Roller Guides

<-link 11 broken ?

Main Frame Preparation

  1. Wide Cylinder Supports
  2. Main Frame Small Components
  3. Main Frame U-Channel Prep-Still needs fab drawings
  1. Make the Press Feet <-link broken?
  2. Prepare the main cylinder

Main Frame Assembly

  1. Assemble U Channel
  2. Fit the Main Cylinder
  3. Stretch the frame
  4. Weld the spacers
  5. Install Small Components
  6. Fit the Drawer Members

Hydraulics

Parts Assembly

The purpose of this section is to assemble all of the parts you made in the parts fabrication section.

  1. Assemble the structural components
  2. Assemble the Soil Loading System
  3. Shaker Assembly
  4. Adjust the Drawer
  5. Install the secondary cylinder
  6. Hard-line the main cylinder

Paint

  1. Cover the hydraulics and any other place that should not be painted.
  2. Check all external surfaces for sharp edges and smooth with angle grinder.
  3. Remove any surface rust with wire brush and / or sandpaper.
  4. Apply a thorough coating of paint to all steel surfaces.
  5. Allow 24 hours to dry before handling.

Electronic Components Assembly

  1. Linked Extension Cord
  2. Sensor Unit
  3. Case
  4. Solenoid Driver v2
  5. Controller Box

Final Machine Integration

  1. Mount Solenoid Valve Set, Controller Box and Sensors
  2. Electrohydraulic Integration
  3. CEB Press Control Code


The Global Village Construction Set
Habitat CEB Press Cement Mixer Sawmill Bulldozer Backhoe
Agriculture Tractor Seeder Hay Rake Well-Drilling Rig
Microtractor Soil Pulverizer Spader Hay Cutter Trencher
Bakery Oven Dairy Milker Microcombine Baler
Industry Multimachine Ironworker Laser Cutter Welder Plasma Cutter
CNC Torch Table Metal Roller Rod and Wire Mill Press Forge Universal Rotor
3D Printer 3D Scanner CNC Circuit Mill Industrial Robot Chipper Hammermill
Drill Press Induction Furnace
Energy Power Cube Gasifier Burner Solar Concentrator Electric Motor Generator Hydraulic Motor
Steam Engine Heat Exchanger Wind Turbine Pelletizer Universal Power Supply
Nickel-Iron Battery
Materials Aluminum Extractor Bioplastic Extruder
Transportation Car Truck

Imprimante 3D Scanner 3D Extracteur d'Aluminum Pelleteuse Four à Pain Presse à balles de paille Extrudeuse à bioplastiques Bulldozer Voiture Presse BTC Betonnière Broyeur à marteaux Imprimante de circuits électroniques Table de découpe numérique Trayeuse Perçeuse à colonne Moteur électrique Gazogène Faucheuse Râteau à foin Moteur hydraulique Fourneau à induction Bras robotisé Poinçonneuse Découpeur Laser Laminoir à plaques Microcombine Microtracteur Multimachine Batterie Ni-Fe Machine à granulés Torche plasma Power Cube Presse hydraulique Laminoir à barres et fils de fer Pulvérisateur de terre Scierie Semoir Concentrateur solaire Roto-bêche Moteur à vapeur Echangeur de chaleur Tracteur Fraiseuse de tranchée Camion Alimentation électrique universelle Rotor universel Poste de soudure à l'arc Plateforme de forage de puits Eolienne

Key Design Planning Prototype Almost done Full Release

Back to Table of Contents