Status Brief

From Open Source Ecology
Revision as of 00:35, 12 April 2012 by Marcin (talk | contribs) (→‎GVCS)
Jump to navigation Jump to search

Related forum category
The Proposal and Development Status forum category can be used for discussions.

Introduction

The status brief describes the up-to-date status of GVCS 50 Projects, Infrastructure Buildout, Worldwide Collaboration, and Organizational aspects of the 2012 Rollout Plan.

See Crash_course_on_OSE for results until 2011.

GVCS

See latest blog post on project scaling - [1]

  1. Power Cube - Beta Product Release, published in Civilization Starter Kit; design complete on Power Cube VI; Power Cube V delivered to Factor e Farm for testing. Lead Developer - Tom Griffing. Last Updated 4/11/2012
  2. CEB Press - Beta Product Release, published in Civilization Starter Kit; Generation 3 Electronics controller tested by James Slade in Texas; test code updated for Arduino Uno - 4/11/12
  3. Tractor - Beta Product Release, published in Civilization Starter Kit; double chain couplers installed on wheels to handle torque of 15,000 Inch Pound Motor. Quick_Connect_Wheels#Axial_Load_Test_Data obtained and improvements are being made.- 4/11/12
  4. Rototiller and Soil Pulverizer - Beta Product Release, published in Civilization Starter Kit. 4/11/12
  5. Ironworker - Build approximately 10 work days from completion - see [2] - 4/11/12
  6. Open Source Automobile - Joe Justice recruited as collaborator - 2/20/12
  7. Gasifier Burner - Prototype I Design complete - [[Gasifier_Burner_with_Heat_Exchanger_Prototype_I. Prototyping bid submitted. 3/1/12
  8. CNC Circuit Mill - Prototype 1 complete and jog tested. See [[3]]. Prototype 2 and documentation in progress. Last Updated 4/10/12
  9. Sawmill - returning to finish build week of 2/12/12
  10. Heat Exchanger - prototype I built - [4] - 2/10/12
  11. Backhoe - posted on GrabCAD - [5] - 2/2/12 - 1/25/12
  12. Modern Steam Engine - Parts shipped to FeF for Hadden Engine. Looking for DPV on machining parts to completion. Bridgeport mills need to be set up and tooling purchased. on 2/15/12
  13. CNC Torch Table - See Crash Course for Prototype I. Prototype 2 gantry delivered to FeF. Need to build base table and electronics/controls - 4/5/12
  14. Multimachine - 2 industry standard Mills ($1200) and 1 Surface Grinder ($1800) secured from Detroit for study of Industry Standards. - 1/21/12.
  15. Bulldozer - Bulldozer Specification defined - 1/20/12
  16. Universal Power Supply - Induction Furnace Specification and Inverter Specification defined - 1/19/12
  17. Universal Rotor - Quick Attach Wheels being explored as basis for Universal Rotor - - 1/19/12
  18. Induction Furnace - James Gibson - power electronics, owner of an induction furnace systems business - promised to produce a 10-50kW base SCR-based induction furnace power supply design; is looking into securing a 20kW furnace for study of industry standards; making an introduction for a visit to another furnace refurbishing company in California. See Induction_Furnace_Power_Electronics_Design_Rationale_and_Specification. Status update: stalled, haven't heard back from James. 1/21/12
  19. Microtractor
  20. 3D Printer
  21. 3D Scanner
  22. Aluminum Extractor
  23. Bakery Oven
  24. Baler
  25. Bioplastic Extruder
  26. Cement Mixer
  27. Chipper Hammermill
  28. Dairy Milker
  29. Drill Press
  30. Electric Motor Generator
  31. Hay Cutter
  32. Hay Rake
  33. Hydraulic Motor
  34. Industrial Robot
  35. Laser Cutter
  36. Metal Roller
  37. Microcombine
  38. Nickel-Iron Battery
  39. Pelletizer
  40. Plasma Cutter
  41. Press Forge
  42. Rod and Wire Mill
  43. Seeder
  44. Solar Concentrator
  45. Spader
  46. Trencher
  47. Truck
  48. Welder
  49. Well-Drilling Rig
  50. Wind Turbine

Global Collaboration

  • Dan Schellenberg, Texas - currently collaborating on a Master Site Plan for Factor e Farm.
  • Roland Sutton (SCORE Mentor) - Contract Manufacturing of Precision Machined Parts and Assys. Started and ran company for 50 years

Status: not contacted

  • Donald O Collier (SCORE Mentor) - Tool and Die Maker White Motor Company Cleveland, Ohio

Status: not contacted

  • Fred W Eaves (SCORE Mentor) - 39 years of electronic and electromechanical product design

Status: not contacted

Infrastructure

  1. HabLab - Roof complete. Needs: base blocks so walls can start; need to move pallets to site. 1/18/12
  2. Open Source FabLab - Windows being finished so structure is airtight. Needs: CEB columns to be finished inside CE1/18/12
  3. OSE Microhouse - v0.5 plans from CoHabitat Group available in Civilization Starter Kit DVD online. Discussing construction details with Floyd Hagerman and Factor e Crew this week. Needs: details finished; integration with biogas generation and aquaponics, and closed loop flush toilet blackwater system. Last updated 1/18/12.
  4. Tooling Up - acquiring 2 mills, one lathe, surface grinder. 4400 lb battery ordered , 12.5kW of Stackable Inverters have been ordered. Ironworker Machine and CNC Torch Table prototype II forthcoming. Will procure hydraulic hose crimper. 1/20/12

Organizational

  1. Recruiting - writing Recruiter specifications and discussing recruiting assistance with Shuttleworth Foundation. Shuttleworth Foundation is currently assisting with recruiting a Technical Recruiter - 1/20/12
  2. DPVs - Sterling McIntosh is currently doing a one month DPV from 1/26/2012 to 2/26/2012; Tom Bamford is here until 2/22/2012

Status + Target + Briefs

Feb. 29, 2012

The present status of the organization is reorganization towards scalable, parallel development capacity. We have run into the limits of scaling based on the lack of a well-defined structure. As founding director, I am personally buried with tasks ranging from prototyping, budget approval, communications, reporting, recruiting, design, facility maintenance, fundraising, and others - with little formal support for these tasks. We currently have a full time resource developer, and part-time assistance on recruiting. We are beginning to interview people for executive and developer roles, but after further consideration of scaling issues on a 5 year timescale, a need emerges to define the values -> principles -> practices -> platform. As an open source project, we are committed to radical organizational innovation. I am getting coached on organizational structure and recruiting. I am meeting with Team Wikispeed to move forward on an agile/lean/scrum method of scalable/rapid, open source product development.

Our target is developing a scalable, open source product development methodology. Value is generated from products and services: incubation of startup enterprise, production, and use case demonstration in the form of applying the GVCS to the building of an autochthonous, 200 person community that demonstrates a modern standard of living based wholly on local resources, at 2 hours of labor per day per participant.ion

There are 6 projects being developed currently via remote collaboration, and we will be collaborating with TechShop on prototyping machines.

Our near-term target (5 years) is the next trillion dollar enterprise - via distributive enterprise - or the numerous startups that we help incubate to produce essential goods for their communities. This is intended as a viable production mechanism for fundamental tools of modern technology- such as tractors, cars, circuit makers, bread ovens, renewable energy equipment, fabrication machinery - including the services that come from such tools - such as construction, organic farms, education systems, wind farms, flexible fabrication facilities, etc.


Prospective Team for July 1, 2012

Recruiting 20, full time Project Directors, Project Director, Factor e Farm Documenter, Executive Director, Factor e Farm Director (site planning, agriculture, infrastructures), Production Manager

Prospective Full Time Project Directors