=Fri Sep 20, 2013=


=Thu Sep 19, 2013=
=Thu Sep 19, 2013=

Revision as of 14:00, 20 September 2013

see Work Log for howto.


Fri Sep 20, 2013

Thu Sep 19, 2013

LifeTrac 6 Modular Wheel Units - Assembly Procedure. LifeTrac 6 Hydraulics - Concept Diagram. Started LifeTrac 6 Hydraulics module page, linked to dozuki. Shuttleworth Discussion on Storytelling. Parkinson's Law of Trivialty. OSE Lasersaur dashboard started. Microcombine Development Board.

Wed Sep 18, 2013

Filled in LifeTrac 6 Modular Wheel Units Production Time Data. Started Operations - Site Maintenance. Started Operations - Budget Reporting. 3D File Diffs on Github. LifeTrac 6 Modular Wheel Units - Visual Bill of Materials. LifeTrac 6 Modular Wheel Units - Assembly.

Tue Sep 17, 2013

Started Purchases tracker. Continuing LifeTrac 6 Modular Wheel Units. Critical Path in Project Manager. Inventoried and secured remaining parts for Modular Wheel Units. Did total of 12 hours in the workshop including cutting/milling/drilling materials for Modular Wheel Units - see LifeTrac 6 Modular Wheel Units Production Time Data

Mon Sep 16, 2013

Continuing LifeTrac 6 Build Critical Path. Beginning on Lasersaur Build preparations. Started LifeTrac 6 Modular Wheel Units. Started Universal_Rotor_Commit_Log.

Sun Sep 15, 2013

Started LifeTrac 6 Build Checklist.

Sat Sep 14, 2013

Continuing Open Hardware Development Critical Path. Started LifeTrac Construction Set Video Script. Started Contributor Log. Updated Universal Rotor Construction Set. Tilting Suspension. Universal Mobility Construction Set. Open law from France - Sharelex. Cleared Microhouse Site - Chris_Reinhart_Log#Sat_Sep_14.2C_2013. Continuing Open Hardware Development Critical Path.

Fri Sep 13, 2013

LifeTrac 6 Deliverables Board. Katie's Bookmarks. Exploded Part Diagrams. Revamping Critical Path for Development. OSH Development Critical Path - Secondary. Open Hardware Development Critical Path. Continuing Development Protocols Needs. Water Line North.

Thu Sep 12, 2013

Graphical Tools Template. Getting ready to clear brush off construction site, source foundation materials, and ready the trencher Trencher Prototype 1 Video for its first real use after modification to new Universal Rotor. OSE Rapid Prototyping. See CAD File Formats from GrabCAD. Favorite Quotations.

Wed Sep 11, 2013

Submitted microhouse pitch to Shuttleworth. LifeTrac 6 Build Critical Path. LifeTrac 6 Deliverables Board. LifeTrac 6 Master Review Checklist. Photo to 3D. Katie's Bookmarks - Vendor Database, Operations Manual, Development Process, OSE Schedule, Staff Meeting, Routing, Material, RFQ, and Work Requisition.

Tue Sep 10, 2013

Updating Development Method Summary and discussed LifeTrac 6 Master Quality Control Checklist with Gary Log + Lucas Log + Dorkmo Log. Had Routine Executive Staff Meeting. Discussion with Karien on New Project Pitch. First Meeting with Catherine Austin Fitts. Founder Dating. Mass Rollout. Universal Rotor Construction Set. Phonebloks.

Mon Sep 9, 2013

Reviewing materials order, and working on Development Method Summary. Open Accelerator.

Mon Sep 9, 2013

Reviewing materials order, and working on Development Method Summary. Open Accelerator.

Thu Sep 5, 2013

At OHS 2013. Potential followthroughs on Lasersaur build, stepper controller finalization, 100km with 1 liter car, One Day Design Sprint - car as model for 4 days of design sprint from 0 to finalization with 0 entry barrier. Potential village pilot in Egypt. Potential keynote in Colombia. Alicia on board.

Wed Sep 4, 2013

Did Budget with Katie. Discussed goals until end of October with Catherine. Preparing for Open Hardware Summit. Docuementing CEB Press Pressure Switch Controller with James Log.

Tue Sep 3, 2013

Submitting OHS Presentation. Defining OSE License Requirements. Updating FAQ. Protocols in Progress. Development Process Graphic.

Mon Sep 2, 2013

OHS Presentation. Reviewing Master Product Development Board and reframing around deliverables in 2013 Development Template - Towards Completion.

Sat Aug 31, 2013

Microhouse preparations - brick pressing and sample carpentry. Microhouse Preparation and Data Collection. Incinerating Toilet Options.

Fri Aug 30, 2013

99 Designs for Nonprofits. Engineering and Open Source Programs for Good. Design Sprint. Rapid Prototyping with Laser Cutter. CEB Press Control Code Flowchart. OS_Microcar_Aug_30_2013_Sprint_Notes. Open Source Optics. Mailing List Protocol.

Thu Aug 29, 2013

Development Templates updated. Katie's Dozuki Documentation Concept.

Wed Aug 28, 2013

Six Sigma Calculations. Critical Path Method. Started Development Protocols Needs. 6 in 60 Video.

Fri Aug 23, 2013

OSE Specifications Evaluation. Recruiting board members.

Thu Aug 22, 2013

John Log left for home and preparing for Ghana, and finishing CNC Circuit Mill in a week to ship back to FeF by Sep. 6.

Sat Aug 17 - Wed Aug 21

TED Fellows Retreat. Potential tractor pilot with Siva Cotipalli. Shenzai with Cesar Harada of Protei. Bristol on HR issues. Paul Wicks on organizational scaling. Angelo Vermeulen on human dynamics on remote colonies.

Fri Aug 16, 2013

Finished Ideal Future State and moving into Future State July 2013 - going over issues and risks. Started Continuous Quality Improvement. Scalable Critical Development Path. Technology Choice Tree Example. Started Design Spring Log.

Thu Aug 15, 2013

Started Interviews Spreadsheet as part of Recruiting Strategy to begin an intentional effort of capturing attention for core product delivery. Started Development Task Durations spreadsheet to begin careful quantification of development time for an entire product that follows the Operations Master Template. 10AM - reviewing Future State July 2013. Created Tasks. Started Work Product Matrix (rename of Aug 2013 template). Forwarding Task Durations. Published LifeTrac GrabCAD Challenge.

Wed Aug 14, 2013

LifeTrac Cab Module Requirements. Reworking Future State July 2013 to start Real Development Board, and integrating with Dozuki template. Finalizing LifeTrac GrabCAD Challenge and updating GrabCAD Challenge Template by filling in Requirements for all Tractor Modules. CEB Controller 5 Concept. Started Product Requirements Template. Started Recruiting Strategy including Recruiting Strategy - dedicated to defining a recruiting strategy for Design Sprints, Dedicated Project Visits, True Fans, and Production Managers.

Tue Aug 13, 2013

Started Shop Inventory Standards. Published editable Workshop Map Template. On the Open IP climate in DC - Sparkfun Testifies in Front of US Judiciary. Started LifeTrac 6 Parts Order. How a Bolt is Made. Updated BOM Template for metal and bolt weights includeig calculators.

Mon Aug 12, 2013

OSE Development Method Planning. LifeTrac 6 Design Rules. GrabCAD Protocol. Recording 6 in 60 Report Script. Scripting HydraFabber Blog Post. LifeTrac 5 Data Collection. LifeTrac 6 Product Development Board. 45.6 Cu In Hydraulic Motor.

Sun Aug 11, 2013

Rural Water Connection. Understanding the Economy.

Sat Aug 10, 2013

Design Sprint - Development_Status_and_Needs#Sat_Aug_10.2C_2013_Plan. Puttting in remaining Modules#GVCS_Modules_Spreadsheet into Dozuki. OSE Documentation Wireframe. LifeTrac 5 Field Testing. LifeTrac 6 Review. LifeTrac 6 GrabCAD Challenge - according to GrabCAD Challenge Template. 10W Laser Cutter Calculations from Tim - 200mm second = .5 mph. Collaboration Architecture for 1 Day Design-Build Event. 10W Laser Cutter Concept Diagram.

Thu Aug 8, 2013

Updated process part of OSE_Specifications_for_Product_Design. Dev template clarity discussion with Katie. Found about Solidoodle-printed car - Solidoodle Car. Refining the Flashy XM Control Panel development process to current process based on 6 in 60 and LifeTrac 5 experiences with Module-Based design to yield August 2013 Development Template. Design Sprint CRM Platform. OSE Utilities Map.

Wed Aug 7, 2013

CEB Press Genealogy. InterLace - commons-based peer production with video. Google Drawing Template. ZoomRP. Initial microhouse concept discussion with Chris - Chris_Reinhart_Log#Concept_drawing_thoughts. Updated Blogging Standards for technical blog posts such as invited to Tim Log for 10W laser cutter. Going over Project Manager Tutorials. Rob is looking for Google_Hangout_Alternative. Limit in hangout is 10 or 15 peeps. First use of Contractor IP Agreement with Independent Contractor Template. James got CEB Controller schematic in Upverter, and began BOM - James_Slade_Log#Thu_Aug_8.2C_2013. Second True Fans Hangout invite.

Tue Aug 6, 2013

Beginning LifeTrac 6 design and development. Team Microhouse Discussion.

Sun Aug 4, 2013

Jung Typology Test.

Sat Aug 3, 2013

Design Sprint - Development_Status_and_Needs#Sat_Aug_3.2C_2013_Plan. Torch Height Controller ready for build - Paul Log. 270 modules put up on Dozuki. Open Source Power Electronics Construction Set Diagram. Need to start CEB Press 6 Development Matrix.

Fri Aug 2, 2013

Critical Path Template. Embedded GVCS Comparison to Industry Standards. Updated OSE Specifications for Product Design.

Thu Aug 1, 2013

Microhouse Build Planning. Open Source License Compliance Audit for software in manufacturing. Refined to Development Template 2.