CEB Press/Manufacturing Instructions: Difference between revisions
No edit summary |
No edit summary |
||
Line 76: | Line 76: | ||
==Assembly== | ==Assembly== | ||
*[http://makeprojects.com/Project/CEB-Press-Prototype-III-Assembly/1437/1 Structural Components]- You'll need to have: | *[http://makeprojects.com/Project/CEB-Press-Prototype-III-Assembly/1437/1 Assembling Structural Components]- You'll need to have: | ||
**[[CEB Press/Manufacturing Instructions/Main Cylinder Preparation| The prepared main cylinder]] | **[[CEB Press/Manufacturing Instructions/Main Cylinder Preparation| The prepared main cylinder]] | ||
**[[CEB Press/Manufacturing Instructions/Roller guides|Roller guides]] | **[[CEB Press/Manufacturing Instructions/Roller guides|Roller guides]] | ||
Line 82: | Line 82: | ||
**[[CEB Press/Manufacturing Instructions/Arms - secondary|Arms - secondary]] | **[[CEB Press/Manufacturing Instructions/Arms - secondary|Arms - secondary]] | ||
**[[CEB Press/Manufacturing Instructions/Feet|Feet]] | **[[CEB Press/Manufacturing Instructions/Feet|Feet]] | ||
**[[CEB Press/Manufacturing Instructions/Legs|Legs]] | |||
**[[CEB Press/Manufacturing Instructions/Brick Holder Plate|Brick Holder Plate]] | |||
**[[CEB Press/Manufacturing Instructions/Dirt-Keeper Plate|Dirt-Keeper Plate]] | |||
*[http://makeprojects.com/Project/CEB-Press-Prototype-III-Assembly-Adjusting-the-drawer/1447/1 Adjusting the Drawer]- You'll need to have completed: | |||
**[http://makeprojects.com/Project/CEB-Press-Prototype-III-Assembly/1437/1 Assembling Structural Components] | |||
*[http://makeprojects.com/Project/CEB-Press-Prototype-III-Assembly-Soil-loading-system/1471/1 Assembling the Soil Loading System]- You'll need to have completed: | |||
**[http://makeprojects.com/Project/CEB-Press-Prototype-III-Assembly/1437/1 Assembling Structural Components] | |||
**[[CEB Press/Manufacturing Instructions/Hopper sheet metal|Hopper sheet metal]] | |||
**[[CEB Press/Manufacturing Instructions/Hopper mounting plate|Hopper mounting plate]] | |||
**[[CEB Press/Manufacturing Instructions/Soil grate|Soil grate]] | |||
**[[CEB Press/Manufacturing Instructions/Soil Shaker motor unit|Soil Shaker motor unit]] | |||
**[[CEB Press/Manufacturing Instructions/Soil Shaker|Soil Shaker]] | |||
**[[CEB Press/Manufacturing Instructions/Grate mounts|Grate mounts]] | |||
**[[CEB Press/Manufacturing Instructions/Hopper supports|Hopper supports]] | |||
*[http://makeprojects.com/Project/CEB-Press-Prototype-III-Assembly-Installing-the-secondary-cylinder/1489/1 Installing the secondary cylinder]- You'll need to have completed: | |||
**[http://makeprojects.com/Project/CEB-Press-Prototype-III-Assembly-Adjusting-the-drawer/1447/1 Adjusting the Drawer] | |||
**[[CEB Press/Manufacturing Instructions/Hoses - Secondary cylinder hose unit|Hoses - Secondary cylinder hose unit]] | |||
*[http://makeprojects.com/Project/Hard-lining-the-main-cylinder/1490/1 Hard-lining the main cylinder]- You'll need to have completed: | |||
**[[CEB Press/Manufacturing Instructions/Frame with main cylinder|Frame with main cylinder]] | |||
[[The Liberator Assembly | Final Assembly and Job Site Setup]] | [[The Liberator Assembly | Final Assembly and Job Site Setup]] |
Revision as of 03:36, 13 December 2011
CEB Press | ||
---|---|---|
Home | Research & Development | Bill of Materials | Manufacturing Instructions | User's Manual | User Reviews | ![]() |
|
Warning: The documentation for the CEB Press is undergoing a thorough overhaul. CAD models and written directions are presently obsolete. For more information, see Talk:CEB_Press#Documentation_overhaul_in_progress. When the models, specifications and text on this article have been thoroughly reviewed, updated when necessary, and confirmed as whole and accurate, this warning may be removed. The CEB CAD model visible above is known, for instance, to outdated with incorrect dimensions on some parts; it will likely be updated only after every component part is thoroughly reviewed and made current.
This page is the starting point for making a CEB Press:
- The Fabrication section details the process of making the parts from raw materials
- The Assembly section identifies the process of putting the parts together to form the machine
- The Programming section deals with automating the process by using a microcontroller called an Arduino to control the hydraulic system
- The Testing section describes processes to perform to test the functionality of a CEB Press
Fabrication
Unless otherwise noted, all steps are independent and can be done in any order.
Simple plates
Good to start with, all you need to do is punch/drill holes.
Structural Supports
- Leg Holders
- Legs
- Feet
- Needs 4 Leg Holders
- Arms - primary-
- Arms - secondary
- Needs 8 Leg Holders
- Grate mounts-
- Hopper supports-
- Needs Soil Shaker (this should be dis-assembled, although you can do it assembled, its just heavier and more difficult to maneuver.)
Soil Loading System
- Hopper sheet metal-
- Hopper mounting plate-
- Soil grate- needs model. 10/7
- Soil Shaker motor unit-
- Soil Shaker-
This build is good, however we're adding in a guard for the hammer soon.
Machine Core
- Soil loading drawer
- Roller guides
- Frame with main cylinder You'll need to have:
- The prepared main cylinder
- All of the components in Main Frame Preparation
- Leg Holders (2)
- Soil loading drawer
- Roller guides
Hydraulics
OPTION:
Manual
- Hydraulic control valve-I will update with my manual version w/pictures and schematic. -Bunny 11/5
Automatic
- Controller Box-The information here needs to be updated with correct circuitry, diagrams and pictures. Dorkmo has a board design that removes the breakout board putting the Detroit and breakout all in one. Will see if he can update with that info. -Bunny 11/5
- Solenoid valve-This wiring needs to be verified. -Bunny 11/5
- Solenoid Driver -Code needs to be verified. -Bunny 11/5
- Sensor Unit
Assembly
- Assembling Structural Components- You'll need to have:
- Adjusting the Drawer- You'll need to have completed:
- Assembling the Soil Loading System- You'll need to have completed:
- Installing the secondary cylinder- You'll need to have completed:
- Hard-lining the main cylinder- You'll need to have completed:
Final Assembly and Job Site Setup
Programming
An Arduino is the microprocessor that controls the CEB Press's actions. It must be programmed with the CEB Press's unique program for making bricks.
Source code can be found at github: https://github.com/OSE/ceb-controller
Old code:
See Also