Marcin Log

From Open Source Ecology
Revision as of 23:47, 6 July 2014 by Marcin (talk | contribs)
Jump to navigation Jump to search


See Work Log for howto. See Wiki Views and Recent Changes Visual Map.

Wed Jul 2, 2014

Posting workshop announcement for MicroHouse 3. For Wordpress: 1. Duplicate latest announcement as a post. Signup form - [1]. Presentation on WordPress template - [2]

Tue Jul 1, 2014

Microhouse Workshop 3 - Script.

At Open Source Ecology - we're developing open source industrial machines that can be made for a fraction of commercial costs, and sharing our designs online for free. In 2011, we published our beta release of the tractor, brick press, soil pulverizer, and power unit - which was our Civilization Starter Kit v0.01. In 2012, we refined the build of the brick press - to a single day of production time. In 2013, we built our first Microhouse - a comfortable, affordable home using onsite soil. Earlier this year, we continued with a second prototype. The goal of the first 2 Microhouse prototypes were to test the limits of a rapid build using a large group of people. Now we are building - Microhouse Version 3 - Open Source Ecology's most ambitious building project yet.

We will be building a spacious, open source home - that is fully code compliant, directly transferable to the urban environment and costs 1/3 of conventional housing. This prototype is designed to be affordable, expandable, and driven by the owner-builder experience - suitable to both DIY and professional builders alike.

The house has 512 sqft of livable space; uses passive solar gain; and has a 2 story double thick CEB wall. The thermal mass will keep the house on average, 15 degrees cooler in the summer - therfor lowering heating and cooling costs. The aesthetics of the compressed earth block allows for minimum interior and exterior finishing, furthering cost savings. Our collaborative build technique allows for simultaneous, prefabricated modular assembly resulting in extremely rapid and labor efficient construction.

Our plan for this house is a 5 day immersion education experience where we go all the way from foundation to finishing. Sign up and be a part of an unprecedented achievement in sustainable construction and open source hardware.



Minutes from morning meeting

Remote

Sun Jun 1, 2014

OSE_Collaboration_Architecture. First session with the crew.

Sat May 31, 2014

  • Cleaning
  • Work Shifts
  • Shopping - stove - width - 30", depth = 25", height = 37" (walmart), simmer plate
  • Van - craigslist - 15 person+ van or bus, under $7k, under 140k miles, KC, Iowa City, Lincoln - withing 3 hr driving radius
  • Hospitality Manual - [3]
  • Inventory - cooking pots, dishes, utensils, soap, laundry detergent, toilet paper, etc.

Fri May 23, 2014

OSE Open Culture. Continuing May Prep. Microhouse Porch.

Thu May 22, 2014

OSE Lasersaur Operating Manual. FeF Pool Construction Guide. MH Finishing Plan

Wed May 21, 2014

Visit to Mid-State Technical College. Summer of Extreme Design/Build Intro Survey. Working on OSE Collaboration Architecture.

Tue May 20, 2014

OSE Service Contract. Moving equipment and cleaning site for bulldozing.

Sun May 18, 2014

Hypermodular Construction

Sat May 17, 2014

Garden planting, prep for bulldozing. Work on 3rd microhouse module

Thu-Fri May 15-16, 2014

U. Waterloo visit

Wed May 14, 2014

CEB_Press_Workshop_-_MREA_Course. Earthworks Plan 2014. This year's second wave of Workshops.

Mon May 12, 2014

Planning Workshops schedule for summer. Planning Gasifier Burner Workshop.

Thu May 8, 2014

Continuing May Prep's Extreme Onboarding with Team Workflow and prep list. Continuing Modular Summer Camp design. CNC Torch Table Design Sprint.

Wed May 7, 2014

Devin Log pulled in Skylar to do Height Controller for oxyacetylene torch table.

Mon May 5, 2014

Updated Assistance Offers. Responding to DPVs, working on http://opensourceecology.dozuki.com/c/Table_-_Modules - with Tyler Log, Anthony Log, and Devin Log. Updating May Prep with OSE Collaboration Architecture. Micro Contribution Form. OSE CAD Download Resources

Sun May 4, 2014

Continuing May Prep - prioritizing Modular Summer Camp first. Workshop Collaborator Survey. Extreme Onboarding. Learning My Sweet Home 3D.

File:Namethefile.skp

Sat May 2, 2014

Modular Summer Camp. Double Shelf


Older Entries

[2]