Marcin Log: Difference between revisions
No edit summary |
|||
| Line 4: | Line 4: | ||
=Tue Apr 20, 2014= | =Tue Apr 20, 2014= | ||
[[Hydraulic Motors Construction Set]] | [[Hydraulic Motors Construction Set]]. [[Velocar Collaboration]]. | ||
=Sat Apr 19, 2014= | =Sat Apr 19, 2014= | ||
Revision as of 21:57, 22 April 2014
See Work Log for howto. See Wiki Views and Recent Changes Visual Map.
Tue Apr 20, 2014
Hydraulic Motors Construction Set. Velocar Collaboration.
Sat Apr 19, 2014
Sent Hospitality Leader offer letter. Bandwidth Management
Fri Apr 18
May Prep. Workshop Preparation Checklist. Updated Facebook Boost howto for finding summer students. Kliment Controller Design. 1030 Steel.
The Apr 17, 2014
Filament Winder - emailed, and found that design does not follow OSHWA OSH definition. Facebook Boost results. FeF PDC. Building CNC Torch Table Team. Started Source Files. Talked to Jose Gomez-Marquez on MIT OSE Club. Talked to Benjamin Koo on agriculture in China - social status farmer to Professional Farmer. Designing multidisciplinary hacker program at Tsinghua University.
Wed Apr 16, 2014
Product Realization Course Assessment. Notes on OSE + MIT from Jose. What Does it Cost to Build the GVCS?. Interviewed Hospitality Leader for the summer.
Tue Apr 15, 2014
[1] - OSE Books. Micro Power Cube.
Mon Apr 13, 2014
Flame Carburization for CEB Press press foot. Need to do calculations on abrasion resistance - metal requirements for open source brick presses.
Sun Apr 12, 2014
Worked with James Wise on CEB controller. See James Wise Log.
Sat Apr 11, 2014
Mental models exploration. Hab Lab Beds. Academic Papers. Wishlist of Metal 3D Printed Parts. Appropedia Merge.
Fri Apr 11, 2014
Michigan Tech University Lecture.
Thu Apr 10, 2014
Building Foundation Forms for MicroHouse 2 & 3.
Wed Apr 9, 2014
Yann's first version of CNC torch table - [2]. Second version - [3]. Height controller - 3rd picture here - [4]. Tilting motor trike - [5]. First tilting electric trike is Yann's work - cost is most interesting. All aluminum or carbon fiber composite. Cost for composite fibers - needs knowledge. Carbon fiber experience - 2 friends. Electrical Problem Statement - [6]. Bat management system - [7]. Industry Standards - [8]. Development (product) - Alpha (May-June) - Workshop (funding from Shuttleworth) (advance on energy pack bat mgmt - or cnc mill/torch) - Crowdfund (kit, for energy pack and machine dev) - Machines.
Daniel Goldberg via Jack Lerner via Adrew Rens - Schook, Hardy, and Bacon - [9] - Megan Roth in Pro Bono department. Big firm with 600 lawyers.
Foundation dug and leveled to +/- 2" over 26 feet of length, 6" of gravel spread on top. Ready for foundation forms.
Tue Apr 8, 2014
Please see our summer schedule - http://opensourceecology.org/wiki/Summer - and if you are interested in applying for a Dedicated Project Visit, please go to http://opensourceecology.org/wiki/DPV and fill out the application form - it should take 15 minutes. To sign up for the MicroHouse and CEB Press workshops - go to http://bit.ly/1lHE2fw. Register for the Microhouse at http://bit.ly/1kFLmqh , and for the CEB Press at http://bit.ly/1kFNfTT . Use Promo Code (bottom right of signup, then hit Apply) - Thank you for your application. The next step is the interview. Please let me know - are you available at _ on _ - CST Time USA? Please use the Conference Call number: http://opensourceecology.org/wiki/Conference_Call. Please fill out the streamlined application - http://bit.ly/1mYeVF5 - it should take no more than 15 minutes. One of the questions is the time frame - which would help OSE plan the summer better if we get that feedback from you now.
Foundation cut list. Finishing CEB 6 Visual Fabrication Diagram.
Mon Apr 7, 2014
New DPV Offer Letter. Instragram Marketing.
Sun Apr 6, 2014
Did a 3 week plan until the CEB Press Workshop. Email List.
Sat Apr 5, 2014
Finishing CEB 6 Visual Fabrication Diagram. Defined FreeCAD Requirements for OSE. Grading for MicroHouse 2 begun.
Fri Apr 4, 2014
Did a Reddit AmA. Troubleshooted that v4 Power Cube lost power on LifeTrac 6 from 3000 PSI to 1000 PSI - pump went bad. Replacing with a newer Power Cube.
Thu Apr 3, 2014
Continuing CEB 6 Visual Fabrication Diagram. Started 2014 Product Development Shedule.
Wed Apr 2, 2014
Tue Apr 1, 2014
Mounted 6' bucket on LifeTrac for foundation work. Metal laid out for Soil Mixer welding.
Mon Mar 31, 2014
Creating CEB 6 Visual Fabrication Diagram. Microhouse Interest List from Chris. File:Grouped FreeCAD File for CEB Press 6.fcstd.
Accounting - general accounting. All flows are recorded, so balance sheet can be made. Fairly clerical. Accounting clerk. Possible to find someone higher up. Tell me what to punch and I will punch it. General Ledger. Accounts, insurance, rent, salaries. To make sense of it is a higher level person. Controller is the person that looks over accounting clerk. Controller can do your budget. Take a smart 16 year old who can do math. That's a clerk. The controller knows how to ask questions to make sense to make of money. Tax accountant - CPA - someone who understands how to do taxes. A tax preparer. Lawyers have legal aids. But ultimate stuff must be done by lawyer. Tax preparer can do the grunt work, but CPA does it for real. Little accounting firm locally. The smaller the firm. Advisors won't have fiduciary responsibility. There are accountants who do this thing who don't work for firms. Outside firms typically have it good in terms of continuity - they should be good on transition.
Sun Mar 30, 2014
Worked on Grouping of CEB press in FreeCAD. Boosted MicroHouse workshop for $200, 25k hits on FB after 12 hours. Usual hits are 5k for good posts.
Sat Mar 29, 2014
Prototype Sedum Panels designed for MicroHouse. Comparing prices of Mobile Homes.
Fri Mar 28, 2014
Microhouse To Do List. Time Log for Manual Template
Thu Mar 27, 2014
Wed Mar 26, 2014
Got 3 gravel trucks in for around HabLab and part of the way to MicroHouse. Septic systems contain A tank and B tank. A tank does the proper offgassiing. Different elevation - goes out at lower level, so leaves a gas cavity. Bottom of inlet pipe will have no water at it. Probably 16 inch riser - goes up above inspection holes - 12" inspection holes. Caps are 16" underground. Send me specifications for tank. Example code: 300 gallons flow requires a 1000 gal tank. Right angle and cap at end of perforated pipe. Flag on it. Bury close to ground. Raised Bed Plan for Microhouse 2
Tue Mar 25, 2014
Micro Power Cube. Tasks - [10]. Bulldozer bid today.
Mon Mar 24, 2014
Filling in CEB Press 6 - Overall Machine - Development Board with existing assets and working on Design-for-Fabrication modification of overall design file. Site Conceptual Plan - Site_Conceptual_Plan#Site_Concept_Plan.
Sun Mar 23, 2014
Infrastructure - tasks by June 1 defined.
Sat Mar 22, 2014
Microhouse finishing all day, final countdown. CEB Press Drawer - rework of Drawer Review Points - CEB Press 6 - Drawer Module - Design for Fabrication Review.
Fri Mar 21, 2014
CEB Press 6 - Overall Machine - Exploded Parts Diagram.
Thu Mar 20, 2014
Open Bidding Collaboration Architecture updated. RFP 1. Kakwa MOU. Started Density Chart.
Wed Mar 19, 2014
U Missouri - Columbia Lecture.
Tue Mar 18, 2014
CEB Press Extreme Manufacturing Workshop - flyer, promo video script, Curriculum, website announcement. Turnon_of_Pages_in_Word_Press. Starting Manual Template. OSE Linux.
Mon Mar 17, 2014
Getting TP Link antenna for OSE Internet. Brick Press Walkthrough Animation - as hide-and-show FreeCAD. CEB Press Workshop Curriculum.
Sun Mar 16, 2014
Working on announcement of CEB Press Workshop and Live Streaming of workshop - [11]. Following up with Jonathan Chaplin on safety engineering for OSE. Dragon Innovation.
Sat Mar 15, 2014
Off.
Fri Mar 14, 2014
Shaking down OSE Internet. Connection to MicroHouse successful via antenna and repeater. Perfecting documentation for Setting Up Development Spreadsheets. Tested with instance of Universal Rotor 2 - Development Spreadsheet Index and Plaster on Dozuki. under Microhouse 1 - [12]. Facebooking on Brick Press workshop, and lining up all CAD files for full manipulability in Sketchup and FreeCAD. Infrastructure Modules.
Thurs, Mar 13, 2014
CAM_Files_Protocol - from Wes Log. Electronics Workshop - concept design. Working on CEB Press. Lauren's 2014_Infrastructure#Summer_Camp. Angle of repose - no more than 30-35% clay with PI of 30 or more, as litle silt as you can to fill in sand interstices - clay has a chemical quality; if too much silt, cement is eaten up, 15% clay, rest is sand. 1/8" material. viscosity.
Wed Mar 12, 2014
Closed Loop Wastewater System initial concept. Asked Big Daddy about range of applicability of soil/slurry mixer concept - Andrew Log. Updated Development Spreadsheet Template to quantify percentage of completion. Started CEB_Press_6_-_Development_Board_Index. Updated Setting Up Development Spreadsheets.
- Collaboration Architecture, CEB: James Michael Dupont - CEB IV in BRL CAD.
- Controller - http://propagelleprojects.blogspot.com/2014/03/ceb-controller-perfection.html
- Marcus
- Molly
- CAE Milwaukee crew
- http://opensourceecology.org/wiki/CEB_Press/Research_Development/Controller_Design
- http://opensourceecology.org/wiki/CEB_Press_Collaboration_Architecture
- http://opensourceecology.org/wiki/CEB_Press_6
Tue Mar 11, 2014
It took me 1 hour to set up 7 Development Spreadsheets for Soil Mixer, while setting up 75 wiki pages for the Overall Machine - Soil Mixer 1 - Overall Machine - Development Board. Now doing the rest - 6 more modules. Took 24 minutes for 6 more modules - or 4 minutes per module. When streamlined - should take about 3 minutes for each Dev Board. This way, I set up about 525 wiki page links at Dozuki for all Soil Mixer Documenation - 1 hour and 24 minutes. Place holders are important because now I can tell somebody to navigate Dozuki for some piece of content, and I can instruct people on exact locations to put content such that anyone can find it. We can perhaps count the number of contributions very quantitatively - summing each Development Board - adding a column where we fill from 0-10 for percentage of completion. Each board gets 75x100= 7500 percentage points for completion - where we can talk about 'tangible points' that are completed in the overall project.
Mon Mar 10, 2014
2014 Infrastructure - added priority list and requirements. Working on Soil Mixer. Kakwa Ecovillage Planning. Logs of Spring Breakers:
- Ben Lloyd Pearson Log
- Eric Potash Log
- Anthony douglas log
- Colten Jackson Log
- Wes Log
- Andrew Graham Log
- Chrisc log
- Laurynn log
- Kyle log
- Catwilmes log
- Michael Seffren Log?
Setting Up Development Spreadsheets. Updated Development Template to March edition. Nonprofit umbrella organization. Legal, insurance, tax, audited financial report, employee issues: Employer of Record, or is it on our payroll. Several grants at $100k. Question: who is giving the grants. Simple question: who is taking the responsibility. Managing RHD - did a 15% fiscal sponsor fee.
Model subscriptions - people pay for viewing the workshop in realtime.
Sun Mar 9, 2014
Design Rationale - Soil Mixer Construction Set Requirements
Sat Mar 8, 2014
Doing CEB_Press_Collaboration_Architecture. Exploring continuous Crowdfunding for RFPs. Set up Dwolla. Setting up a prototype of Crowd Funding. Created a Thank You for crowd development contributors. Started Instructional_Manual_-_Crowd_Development.
Fri Mar 7, 2014
Decided on Sedum Panels for living walls. Bought materials for HabLab upgrades for Alternative Spring Break.
Thu Mar 6, 2014
Missouri Organic. 68 miles from Missouri Organics - $35 per cubic yard - $120 delivery - 20 yard truck - $779.04 with tax. Natural darkwood - mixed mulch - $13.95 per cubic yard. Cedar - Janice - $125 delivery. 422.30 including tax.
Mon Mar 3, 2014
Added graphic from Development Overview to main OSE website under Development.
Sun Mar 2, 2014
Alternative_Spring_Break_2014 full, 11 people signed up. Went over Kakwa Ecovillage Planning. Subzero weather in Missouri, and the experimental microhouse water pipes had a leak. Still need to figure out the internet for the microhouse - looking at satellite, as the 2 mile polorized antenna is not cutting even 500 feet. Expaning chimney for longwood stove from 6 to 8 inches, installing radiant propane heater for Spring, and upsizing on-demand propane water heater. Beginning experimental blackwater maceration + worm bed system.
Older Entries
- Marcin Log - April 2014 - Workshops
- Marcin Log - March 2014 - Spring Break
- Marcin Log - February 2014 - New Beginning
- Marcin Log - January 2014 - Vacation
- Marcin Log - December 2013 - Wrapping Up a Page
- Marcin Log - November 2013 - Laser Cutter
- Marcin Log - October 2013 - Ironworker + Backhoe
- Marcin Log - September 2013 - LifeTrac 6 + Microhouse
- Marcin Log - August 2013 - LifeTrac 6 Prep.
- Marcin Log - July 2013 - LifeTrac 5 in NOLA
- Marcin Log - June 2013 - Sprinting
- Marcin Log - May 2013 - Rough Taste of Freedom
- Marcin Log - April 2013 - OSE 2.0 Beginning
- Marcin Log - March 2013 - End of Slumber
- Marcin Log - February 2013 - Operations Manager Recruiting
- Marcin Log - January 2013 - The Next Phase
- Marcin Log - December 2012 - Time for the Christmas Gift to the World
- Marcin Log - November 2012 - Stabilizing
- Marcin Log - October 2012 - Heating Up for Winter
- Marcin Log - September 2012 - Collaboratorium. Back to logging Sep. 13, 2012
- Marcin Log - August 2012 - chaos
- Marcin Log - July 2012 - exile
- Marcin Log - June 2012 - heat
- Marcin Log - May 2012
- Marcin Log - April 2012
- Marcin Log - March 2012
- Marcin Log - February 2012
- Marcin Log - January 2012
- Marcin Log - 2011
[2]